Saturday, July 20, 2024

Closing Credits

The only ending to this missive is to give credit to the constellation of people and energies that conspired to make this vision a reality.

First and foremost, I have to thank the COVID pandemic and its requirement to quarantine.   That event catalyzed the time and presence with Buzz and Jean that cultivated our connection and laid the foundation for this project to even be considered, let alone agreed upon and launched.  For sure, our days and hours of hanging out created a base of experience with one another, trust, and ultimately the desire to let this happen.  I am forever grateful for that "forced togetherness" and all that it yielded.

There aren't enough words to adequately attend to my gratitude to Buzz and Jean for their generosity (as in, making this location the place for this home!) and persistent kindness, enthusiasm and shared geeky interest in every step of this project.   

I have been buoyed by the uplifting, loving support of SO MANY people..it mattered.  A lot.  I could feel the wave of "possible" as it built throughout this experience - fueled for sure by all the optimism and cheerleading - it carried me through the many waves of both happy events and challenges.  Since most people ask, this home went from raw land with a permit to the house I live in now in 10 months.  Not bad.

Then, there's Team Taya.  If you've read this story from the beginning, you know there was a rich diverse range of talents that made this thing happen.   I was and am in awe of the intelligences I don't possess that others brought to bear, the skillful talented means and the high bar of quality that was applied to every step of this construction.  In addition to the litany of friends and family who helped on so many fronts - clearing land, connecting to resources, loaning me trucks and tools, helping with the move, and even contributing financially - here's the roster of all the people who made this literally happen, and it will come as no surprise to you that I love that I know each and every one of them:

Trade Team


Architect John Howland


Deltec Project Manager Mark Bennink


Soils Engineer Dave Gius


Civil Engineer - Septic Kurt Kelder


Caldwell Trouette Contractors Casey

Joe

Steve-o

JoJo

Francis

Steve Fogle

Ruben

Santiago


Grading/Septic Install Jeff Caspersen

Derrick Caspersen


Foundation Steve Marcussen

Alejandro 

Pump guy


Plumbing Micah Boncorso & Crew


Electric Joe Lickey

Alex


HVAC  Dennis Furia

Ryan


Shell transfer on delivery C&A Trucking - Cathy and Brad


Shell Assembly/Framing Jeff Torr

Mike Williams

Robbie


Metal Roofing Abel Martinez & Crew


PGE Brandon Butulia


Cabinets Thomas Loos


Drywall Tsarnas Crew


Tile Dennis Ward

Danny Ward

Raul


Paint Jeff Patton & Crew


Septic Kurt Kelder, Civil Engineer


Solar Jonathan

Danielle

Justin


Etched Glass Door and Panel Emp's Graphic Eye - Bill Empey


Vegetation Clearing & Chippering Paul Waddington

Archimedes Cruz

Mike Kammerer

I am sure I'm forgetting or overlooking someone.  On August 29, which will be the one year anniversary of getting the building permit, I'm having a Team Taya happy hour to show some gratitude to this group of people and truly celebrate this project's completion.

With that, I'm ending this routine of publishing the progress on the not so linear path to my forever home.  😊














 







































































































Friday, July 19, 2024

FINAL is FINAL!


Today we passed final inspection to complete the building permit and legally occupy my house!

Done, done and done.  The punch list was short, and there are things to do outside in the coming months, but this place needs no more action for it to be complete.  And it feels so.

Hard to describe but there's a shift with the having gotten over this hurdle.  It has to do with no one else has any ability to make this either not happen, or happen differently, any more.  Somehow, that's a thing in me that I will reflect on further but suffice it to say, it's profound.

The glass panel for the bathroom was installed today too, so really, there's nothing left to do!

Like the saying goes, no more to do, just be.  I am looking forward to just be-ing in this space!  Here, the sunrise on this first morning of this new chapter....lucky me.

Thursday, July 4, 2024

Finish Line or False Summit?

I’m in.  I’m spending my first night at the new house tonight.   I got here early today, made coffee and breakfast for the first time.   Ran a load of laundry for the first time.  Mostly I’m reading manuals to understand how everything works!  The main thing I notice, however, is it’s not a visit this time.  It’s not just being here to get something done and going…it’s staying.   I get to sit here all day.   From now on.

Angsting over and anticipating this event – it’s momentous and pedestrian at the same time.  The getting here didn’t go nearly as I imagined, and it was largely painless.   The suffering involved was the heat!  We’re in a week long surge of extreme hot and dry weather, red flag warnings and winds.  

 

 

Settling in is happening pretty swiftly.  Dana Hampson, at whose home I’ve been staying since evacuating for the fire, is an organizing machine.   She helped me move into my last place, and this time she put my kitchen together before I knew it.   I marvel at people’s ability to just see how it all works and make it happen so quickly!

 

I can see more purging in my future…my sister is coming tomorrow to help me go through things and next week, my friend Bobbie is arriving from the east coast to help me get it all together.  We’ve shared many a move over the 40+ years we’ve known one another, really delighted for her to be here and help me settle in.

 

Some final-ish tasks have been done as well….

 

Last weekend, I had more vegetation cleared, now that elevation is established and you can see out the windows!  Opened up the vista just a bit, cleared out some scrub oaks.  The vegetation pile is huge…planning on chippering it, using that to cover the down slope at the front of the house to keep the dirt from blowing too much and in the winter, it’ll be a nice blanket over the soil to keep it from becoming a mosh pit.  

 

My retractable screen door was installed this morning for the french doors at the shower.  

And, the same amazing skilled human, Francisco, repurposed the trellising that had been a screen for the port a potty, (remember this?)

and created another screen, this time for the A/C compressor. 

So on the one hand, mission accomplished!  On the other hand, as any of you who is a home owner knows, it’s never really done.  That’s why I think about false summits…a cycling thing…when you ascend up a hill, seeing the summit at the top and upon arriving, only to discover there’s yet ANOTHER peak not visible from down below.  This whole project has been that…achieving some milestone, or completing a thing, only to recognize, there’s MORE.  I’ll take this moment of completion….and recognize there will be things to do for some time to come.


It's Independence Day…one could say this is a day of independence for me with this move.  I think of it as a celebration of what has been accomplished through dependency and interdependency.   This house would not exist without the contributions, support, skill and loving energies bestowed by many, many people.   So, reframing the occasion, today I celebrate being in-dependence.   A good stretch for this solo-living human.  May your day likewise offer an opportunity to reflect on your state and celebrate.

Friday, June 28, 2024

Last Gasps of Effort, Modified Migration, Endless Adaptation

Consistency....sometimes to be rewarded, or even seen as an asset.  One thing I can say about this project is that there have definitely been some reliable consistencies. Chief among them, any plans that I may have in my head being modified, eventually.

Such is the case with my notion of the great migration that would take place as the work on the house concluded.    I have a history of moving between places that usually is carried out with organization, order and efficiency.  (Are you laughing yet?!)   This ain't going that way.   I had envisioned and anticipated the painting work would be concluded by the end of this week and my move logistics have been set up with that expectation.   Ha.

The painters let me know they wouldn't be done by then.  I have to be out of my current place by Sunday, June 30, so a bit of wrangling to adapt has been my mode this week.  It's all good, just different than I imagined, true to project.

My old place is cleared out and cleaned, with my things staged in the garages.  On Thursday I was going to transport all the "outdoor" items (planters, etc) and set them up temporarily on the back patio as the painters need the front patio for their work, the spray tent, etc.   I texted my landlords that morning, checking in about my departure status and inquiring whether I would see or interact with them before June 30...a legitimate question since they have not been at the property since Halloween weekend.  Their reply was "we're in London for about a week..let's get coffee when we come up there in a few weeks."

I have been wrangling shifting logistics for what feels like weeks (ok, maybe a year and a half but let's not exaggerate too much!) and the discovery of this reality, that they were not and would not be around over the coming week made me wonder why am I going through all these moving gymnastics when it seems I could just wait until the painters are done...so I asked, could I leave my things in the garages to ease the logistics of the move and they said of course.  That shifted everything....so now, nothing further will be taken over until next Wednesday.   

The pad for the hot tub got set!  Those pavers are perfect....

Today, the hot tub was delivered and my old one was taken down from its perch on the deck and removed.  Even THAT process revealed yet another thing that hadn't been attended to but needed to...code requires a disconnect panel next to the hot tub, that got installed last week by the electrician.  The tub installer, however, was reliant on a whip available (which is basically wiring with flexible conduit) to direct connect the tub.  I texted my electrician, Joe (Denny's Electric) and made the desperate plea for it to be installed before the scheduled delivery and voila!  It was put in at the crack of dawn today.  When I showered Joe with appreciation he said "who's your buddy?!"  😍

The pad is perfect for the tub, and it arrived and was installed with little fanfare, the setup let it be smooth and easy.

Once it was set on site, we went to the old place and removed the hot tub I had there because the installer took it and gave me money for it!!!   That was a bit of a challenge...the tub has been on the deck, 13 feet up in the air, and the only way to get it down was over the railing.  I rented a beam lift, which is essentially a hand crank operated forklift, and the guys got it done.  I don't have a lot of pics of that process because I was jockeying the truck, steadying the beam lift but trust me, it was a feat.

Grateful that went as smoothly as it did!

This morning, we passed the fire and CalGreen/Title 24 final inspections, which should clear the way for the final inspection to happen.  I'm going to PRMD on Monday to make sure the way is paved...their online system shows some things holding it up but it's about them connecting the dots of their own system since everything really is in place and readiness.  It never ends.

Finishing work continued to be prepared for final inspection.   There are code requirements for the landings outside any egress door (who knew?) so I was able to get the pavers installed for the bedroom and bathroom doors and check that box before final inspection also.


(That pipe is a septic cleanout that will get cut down now that the pavers are in....probably do a cute little box over it ultimately)

And my excavator, who everyone refers to as the GOAT in this valley...finished the driveway.  It was one of those things that *could have* waited, but also one of those things to get done right and while the equipment and people are on site.   Pretty cool process.  First they lay down landscape fabric in the 6" cut in the surface.

Then, a mixture of crushed rock and dirt is laid down and groomed into place with slope and surface taken into consideration:



In the meantime, I've decamped (since evacuation really) to my friends Dana and Kalei's place, a sweet space on the river, with loving support, until I can lay my head down at my place.

Next week, the post should be, "I'm IN!"  We shall see.....

Friday, June 21, 2024

Fast Forward!


The wildfire was snuffed by mid-day Monday, but the evacuation orders and power were still obstacles to overcome to be able to get back to work on the house.  Fortunately, everything lifted by Wednesday and the crew was back at it in earnest!

The electrician completed his interior tasks, hooking up the cooktop and and the under the sink connections.  The only remaining tasks on that front are to complete the required EV charger, which necessitated putting a post in the ground, and the electric hookup for the hot tub which despite it just plugging into the wall, code requires a post with a disconnect panel...of course!  The posts are in, the final connections will happen in the coming days.


 

The earthwork continues...it seems it will never end!  Preparing the perimeter for pavers to go in, creating the steps out of the bedroom and bath.




 The A/C Splits' compressor was at last installed too!


 


Amidst all that, the cabinet maker came and put the fronts and handles on the cabinets...they're DONE!




There is literally no work left to do in the house except the last coat of paint which begins on Monday!  I moved in some of the bigger pieces I have so as not to mess up the paint job bringing in awkward and bulky things.  Everything else is out of my place and in the garages below my unit.  I will shampoo the carpet in the bedroom tomorrow, someone comes to do a final clean on Monday and the rest can migrate after the painting is done.


There are several inspections that need to happen before we get final.  Fire inspection, Title 24 and CalGreen (environmental and energy regulations and requirements) are next and then final..should be all clear the first week of July but....I chuckle at my adherence to any kind of schedule!

Monday, June 17, 2024

Mother Nature Had Other Plans


Well, it ain't over till it's over.  Today would have been the day the electrician came to finalize connections so the cabinet fronts could be installed tomorrow.  But then, yesterday a wildland fire broke out a few miles down the road and everything changed.

The Point Fire, as it's referred to, began (source unknown) at 12:30 pm yesterday.  It grew rapidly and before we knew it, evacuation orders were being issued.  The risk was that the fire was headed directly to the new house site, with 30 mph winds fueling its progression.  The first sign I got was when I looked out my windows where I'm living now and saw this:

I knew this thing would be triggering for folks around here and it certainly was.

This may not mean much to you, but the image above shows the zone given mandatory evacuation orders in yellow.  The fire is at the north west end of the map, my new home is in the little notch of the NOT mandatory evacuation zone, and my current home is where the blue dot is, in the lower right corner.  That zone was given evacuation warning orders.  The winds were extreme and the fire was growing at a rapid pace, headed directly for the property.

By 3pm, the fire looked like this:



 

Those photos are right up the road from me, about a mile.

 
Buzz and Jean wisely chose to evacuate.  I helped them load up what they wanted to evacuate with, in a car and a truck, and got them, their dog and a cat, to a friend's nearby.

I gathered my things, while only under warning, not mandatory, I really couldn't stay at my house without being able to open the windows in this heat...so I decamped to town and am staying with friends.

Fortunately, there's not a lot of fire activity in the State (although, there wasn't, today several fires ignited given the red flag warning conditions) so a lot of resources were available, both people and equipment, to attack this thing.




Aircraft filled the skies for hours...as the fire grew rapidly and our local fire Chief shared that given the winds, he fully expected the fire to travel down our road well to the south and east of us and advised to get out before it got chaotic.  

OK..so this is the week I'm moving in, and a wildland fire strikes with a path aimed directly at my house?!!!  Are you kidding me?   The only saving grace I could think of was gratitude for having secured homeowners' insurance effective June 1!

The final update for the evening last night showed optimism for progress given the equipment and personnel available through the night.  Sonoma County had the first night flying helicopters on duty, dropping water at night - never before done here. Check out this video of the flight over the fire last night, pretty impressive!  

https://x.com/i/status/1802580535019270252

The winds were kind to the firefighters last night, they made good progress and today, turned the corner to control from reactivity.   Evacuation notices have not been lifted yet and power is still out at the house site so work cannot proceed, yet.  We have to wait for the incident to settle, and power to be restored.  Here is where the fire ended up:

 

And here's a bird's eye view of it all the day after:

 https://www.facebook.com/GoreCountry/videos/493842879665207

 I will move my things in on Thursday...and the painters will still come next week but damn, what a sobering reminder how everything can change in an instant!

Grace, yet again.....



Saturday, June 15, 2024

Completion Happens

Epic week of activity....more things that have been in my head are now out in the world.   Here's the recap:

Monday - Countertops were installed!!  Amazing process to watch - and these guys did it all in about an hour and a half...the surfaces had been cut to measurements in the template, with the prescribed edging.  On site, they cut holes for faucets, sinks and the cooktop.




 

Squirt Test for the Septic System...yes, a squirt test.  We passed.   That allowed for the fill of the leach line trenches and grooming of the hillside where the leach field is.  The ceramic structures are monitor well caps.  The County required, at the time the septic plans were approved, that there be monitor wells and I would be required to submit monitoring reports twice a year - validating the system is working properly.  The last inspection for that was for the well caps, ensuring the wells were at the correct depths, and it paves the way for the septic permit being finaled - a pre-requisite for the building permit being finaled.  That inspection got scheduled for Thursday and it resulted in the Septic Permit being finaled!!!!  We are DONE with that.  And, at that inspection I learned that the County no longer requires the monitoring and reporting - oh, thanks for that, so happy I incurred the cost of that element of the system unnecessarily.  Sigh.

Tuesday - I got lucky and sourced some reclaimed pavers from the reclaimed materials place where I got my doors and my sink.  I need them to create a pad for the hot tub, and steps outside my bedroom and bathroom doors and a walkway to the entry patio.  The weight of the palette of pavers required a one-ton truck so I rented one and got help from my friend Kalei to get them, and more importantly, unload them by hand...they used a forklift to put them in the truck.  I took one palette of 240 pavers, enough for the hot tub base and thought I'd do the rest another time.  After unloading and stacking them, I thought while I have the truck, I should just go get what I need, so two more palettes later, Kalei and I unloaded 720 pavers...in 102 degree heat!  🥵

They get placed on June 27, hot tub arrives June 28.

Appliances were installed, plumbing was completed...all the hookups to the sinks, bathroom (yes, the first flush happened!), hot water heater and the utility sink I plumbed into the back patio.  It makes everything come to life more and more...



 

Wednesday - Plumbing continued, grooming of the soils around the perimeter of the house, both to bring dirt back up to the foundation and create both level areas for the hot tub and the compressor for the A/C Splits - they have to pour a small concrete pad for it....



 

Thursday - The final septic inspection happened...and with that, we move on!



So...on Monday the electrician comes back to do the final connections of appliances installed, do the under the shelf lighting above the kitchen counter, the EV charger station and the dedicated outlet for the hot tub outside.  The A/C Split compressor work will happen and then next week the painters come in...that's it.  That's all that's left!

And here's the big news....I'm moving all my things to the house THIS WEEK!!!!  

Stay tuned....we are almost there....