So where are things now?

Since bringing Casey on board in mid-January, he has been putting the team together that will do site prep, grading, foundation build and concrete pour.  That's the phase of greatest importance given we are hoping to be able to have the shell delivered by early June.

When Casey and I met, neither of us could believe we hadn't met the other before...I think between us we know almost everyone in town.   He's worked on so many people's properties I know about...and, he's got a project management approach that welcomes my involvement to the extent that makes sense.  I told him I would get as far up into it as he'd welcome but would not want to be the obstacle so between us we monitor that line.  I'm learning SO MUCH.   I geek out on all of it and welcome having an intimate familiarity with every aspect of what is involved in bringing this into being.

So, who's Team Taya?

Architect,

General Contractor, 

Excavator/Big equipment operator, 

Geotechnical Engineer, 

Civil Engineer, 

Electrician, 

Plumber, 

Concrete Foundation Contractor 

- so far!  We've met at the house site a couple of times because the grading plan is not straightforward or obvious.  This is one of the consequences of my "out of sequence" execution of this. I chose a slab on grade, given the relatively level site and the ease and economy of the choice.  Now that we're looking at what the soils and slope dictate, it's taking some solutioning to determine the most cost effective grading and foundation approach.  Fortunately, the team is really experienced, local, and they all have my back for which I'm grateful.  My brother in law has suggested a remedy that's being explored and hopefully we'll get that dialed in by the end of the month.

I've reached out to a neighbor who does a lot of vegetation management and forestry support for properties around here who's also a big equipment operator.  He and I are going to do another pass on the vegetation clearing to enlarge the envelope and get things ready for the excavator.  I'm psyched to get back to learning the land that way.  

Timeline, you say?  🀣 If only....and, if the stars align and everything flows as well as it can through the bureaucracy of PRMD, we hope to have permit(s) in April, so the site prep can happen in May and the shell can come in early June.   

Another piece of grace in the process...when I lost Damon as the builder, my Deltec rep told me about consultants they have (independent of the company) who can come meet the truck on arrival, supervise the unloading and array of all the resources for optimal assembly efficiency and supervise a local crew to put it all together in 3-4 days.  πŸ€ΈπŸ’«  So I immediately reached out to Jeff, my new BFF, who lives in Texas and he will do just that...come, support the correct and swift assembly of the shell.  Such an insurance policy for the manufactured components being put together right, the first time.  Not that I wouldn't have faith in a local crew, but this cuts down on the guesswork, the learning curve and the time involved to figure it all out without it.  Cannot wait to have Jeff join the team here!!  

Loving this...every little thing about it....

Stay tuned!

O.M.G. It exists!!

If you started here and didn't see earlier posts related to this home type, a quick recap.  It's round, made up of 14 panels and roof trusses that are a manufactured shell that will get attached to a slab foundation.  The panels and roof trusses were manufactured last week!  Here are some pics to give you preview of coming attractions.  Note that the windows are installed, and the siding is painted and installed as well.  Wohoo!!!






 






It's About Place

That's been my email address since I moved to this area...itsaboutplace@gmail.com.   I have, in the course of my time living here, been fortunate to come to know people who live with a deep relationship to nature, land, places.  I've benefited from looking at where I am through fresh eyes and the sense of place, the awareness of connection to and interdependence with place have become really important foci of my attention.  

SO, where am I building this thing?  On a gloriously situated property owned by my friends Buzz Bauer and Jean Hamberg, who have lived in Dry Creek Valley since 1983.  It's about 3 miles down the road from where I am now, on the same road even.  

They are each and together among the most loving, kind and generous people I've ever come to be embraced by.  I met them when I first moved here (17 years ago!) and we have a circle of shared friends.   When COVID lockdowns happened, they were the people I spent time with - I could easily walk to their place, it gave me some contact and an option away from my nest and it served us all well to "bubble up."  That shared experience and time in place with one another was a huge contributor to the confidence and trust we feel in entering into this arrangement together.   We have had the luxury of hours of conversation, exploration, clarification and harmonization.  It's created a strong weave of ability to deal with the myriad of issues and activities this project generates.  They're having a lot of fun with this too...it's an energy infusion for all of us for sure.


A little bit about Jean...there was something about Jean that drew me to want to know her more when we first were introduced...an intuition I'm familiar with...and I'm grateful we have evolved our friendship over the years. She is a very intuitive person herself, often seeing into situations in ways I don't and that's always a great place to connect.  

She is super smart, and quick with it!  Her career included being the lone female redwood timber sales person in her environment and besting the men in sales routinely.  Like, I can't even track the stuff she's told me about that chapter and she was obviously really good at it.  All that comes with a big big heart.  

She bought the land where I will set my forever home, a source of pride and a legacy she is sharing with me, for which I will be forever grateful.

There are furry family members who need their mention because they really run the place.  LilLy is a golden retriever and Linus is the cat who trained her.  There's a second feline who makes rare appearances, IttyBitty. 

 

 

Buzz Bauer - pictured here gazing out over the valley with the trusty buzzard perched in the distance.  This place makes you want to do that...gaze out into the valley.  For hours.   Buzz is also standing above his vineyard.  He is a retired wine maker.  

Buzz, too, has a huge and apparent heart...and his personality is focused on enjoying life and I'm grateful I get to enjoy spending time with him.


 

 

 

So here a glimpse into the where of it all.  


The red marker in the upper left is the location where the house will go.  The blue marker near the Simoncini Winery label is where I live now.


This is the piece of land on their parcel where the house will go.  To give you perspective, here is where it is in relation to their house which is farther up the driveway...this image is taken from in front of their home, looking down to the parcel which is a straight line from the fence post in the foreground:



A year ago this month (hard to believe it's been that long already!) I did a bunch of clearing to get a better handle on the available footprint for the house.  A neighbor who has shared his skills and tools with me helped and I cannot believe how much I love me a chainsaw!!!  πŸ’ͺ😍

So now, the site is a bit more cleared, more vegetation clearing to come but here's what it's like now:


Oh, and I built that picnic table!  I'll do a separate blog post about that - so fun!

So this location is absolutely gloriously situated on a bench about 200' above the valley floor of Dry Creek Valley with vistas for days.  I haven't completely groomed the vegetation around the house site yet, waiting for elevations to finalize that thinking but this is what will be my vista:


I hope I never get over the fact that I will be gazing at that for the rest of my life. 

 

 


 


 


 

Walking the Path One Stone at a Time

This will be the last wordy post, I promise....a little context seems relevant to appreciate the present status, and this may be way more than anyone is interested in...some of this I'm recording for posterity! 

If you know the project manager in me, it will come as no surprise I had an image of this process, based on that long arc of time I had in my mind, of how things would go/flow.  Who knew pursuing a forever home would be the spiritual practice of a lifetime.  From the very first spark of imagination about this, I have felt like there have been stones in the path laid down that I've attempted to follow.  And much like when hiking in the wilderness, knowing where the trail is can matter and be the difference between an enjoyable experience of nature or a life threatening one, just as straying from the path can lead one into more arduous and thwarting challenges that aren't required - or are they, to learn what needs to be learned?  πŸ€”

The path to now has been far from linear or predictable. 

To recap, I imagined a process where, having gotten clarity about what I wanted to create, I would figure out where it could happen then set about to make it happen.  πŸ˜‚  I have been told repeatedly that I am doing things "out of sequence" which I get opportunities to realize routinely.  

Initially I was aware my inner project manager (fueled by a pretty good dose of egoic energies!) was ready to roll..cue Jack Nicholson and "I'm Baaaack!" πŸ’ͺ  It didn't take long to realize that in the world of construction trades, I don't know the customs of their people, can't speak their language and, I'm female.  Serious 3 strikes that make it WAY harder than it needs to be...getting to that realization was a process in itself.  I have to say before I forget that I have been SO supported along the way by really knowledgeable, skillful and generous people.  Here goes that story line and cast of characters.

In the early conversations with my Deltec project manager wherein I was trying to get as full a picture as possible of what would lay ahead if I chose this and went for it, I asked if anyone had built a Deltec anywhere in the area - low probability given it's more known on the east coast and it turned out the answer was yes - a home far more complex than mine (multiple floors, a garage and master suite addition, etc) was built out at the Sonoma Coast about an hour from me.  I asked if he'd reach out to them and see if they were open to my coming out there and learning from their experience of getting one of these homes built in this County.  He did, they were, and I went.

I came away from that interaction with two golden eggs (and, two more stones in the path!) - they used a builder who is local so there's someone in this County who knows this structure and wouldn't have the learning curve an otherwise competent local contractor would and, the architect they used to prepare the plans for the building permit.  Both felt like gifts that spurred this little vision along so I reached out to the builder, Damon, immediately.  He turns out to be a gem of a human being, raised on a Sikh commune in Mendocino County, grew up doing forestry, then wood work, carpentry, then full on contracting.  He only takes one project at a time, and was not going to surcharge materials and welcomed collaborating with me in ways I could save on his efforts, a really good fit.  Purest heart I've encountered in a long time and I felt like I won the lottery on general contractor/builder!  Spent about a year and a half cultivating that relationship in preparation for the time when we could actually do something to move this forward.

I am fortunate to have a Geotechnical Engineer brother-in-law who is graciously leaning in to this project on the heels of his retirement.  Good timing on my part!  He was my early, and remains my consistent, counsel on what I need to do when - a sherpa in the unfamiliar territory of building.  First things first, I got a Civil Engineer to create a topographical map, the key to the architect's ability to site the house and create a site map - foundational for everything.  I've learned that these technical people, upon whom I am dependent, are masterful at saying what they will do and rarely committing to when they will do it.   Oh, and I've learned a lot about how uncomfortable dependency is for me - not a news flash but a fresh reminder!  πŸ˜’

So in 2022 the Civil did his thing, prepared the Topo map - which I thought would be done in about a month and it took 3, that graphic above is so apt!   He then moved on to design the septic system.  My brother in law did soil samples and provided his expert analyses, the County declared given the soil type a wet weather perc test was required so that put the entire process on hold until we had 20" of rain.  The County declared perc test season open in Mid-January 2023 and the Civil carried on with that work so as to be able to finalize the system design and submit the septic permit application.  That just got done this past week and I'm paying for expedited processing given the elongated timeline to get to this point.   

Deltec structurally engineered the shell plans, ensured California's Title 24 requirements are met (affects window types, amount of glass allowable, insulation and fire protection required) and handed off stamped plans to the Architect who layered on the Mechanical, Electrical and Plumbing layers, along with everything else the County requires and submitted the package to the Permit and Resource Management Department affectionately referred to as PRMD.  That happened on December 29, 2022. 😌

Here's an "out of sequence" impact...I signed a manufacture contract with Deltec in October 2022 to evade their annual price increases.  At that time, we anticipated being able to put shovels in the ground in March - actually that has been the imagined target timeline all year.  Given the range of things that did and didn't happen as imagined in 2022, we are a few months off. So once the permit application and plans were filed, I reached out to the builder, Damon, to see about a meeting to look at what needed to happen before shovels could go in the ground and clarify what I will be doing what he will, etc...and on January 3 he sent me an email telling me that he would not be able to build my house after all.  His uncle fell down a flight of stairs in the middle of the night and was paralyzed from the waist down and Damon would be moving to Colorado to retrofit his uncle's home with ramps, elevators and wider doorways.  Did. Not. See. That. Coming.  πŸ˜±πŸ˜¬πŸ€”

Yet again, grace on the path...I've had a couple of "wins" on the bureaucratic front.  Was successful in navigating through PRMD to get to confirmation that this project is exempt from the usual requirement of a well yield test and that the groundwater availability is within approved limits and that will not be in dispute.  Might not sound like much but in these parts, living in an agricultural zone amidst a drought - it was a HUGE hall pass.  πŸ™Œ

Once Damon told me about his shift, I realized I had about 4 months to get a new team together and get a lot of things done I didn't previously imagine I'd need to be engaged with having Damon on board.   I threw myself at the feet of the people I know in the trades in my community and was met with caring supportive counsel from several general contractors I know who are more retired than not (I learned they never really retire, they just migrate to doing their own projects vs for others..).  

One of them was Rob, who when I called him even his voice was like a salve and he said "Taya, I'll do whatever I can to help you get this done."   We met, I shared the house plans, and he suggested I consider being an owner/builder and we talked through the various routes I could take.   One of the key factors in this entire undertaking is the assurance of liability insurance and/or indemnification for the property owners and me, and the arrangement of workman's compensation contributions required by the State of California.  If Rob were my support system, I would have to take on those responsibilities and expenses.  If I source an active General Contractor, while there's a 15% markup, I don't incur those costs...tradeoffs to weigh. 

Rob was such a soft place to land in the thinking and redirecting I needed to do.  That same week, I had dinner at a friend's who had invited a couple as well, and the wife could not make it.  I share that only because the trio of us ended up in territories of conversation we might not have otherwise - namely, a function of the realization that the person who came to dinner is a general contractor, Casey.   Once he shared that, it was unavoidable to discuss the house project and he was intrigued by it enough to want to meet and see the plans and talk about what the status and needs were and we did.  Casey has become the General Contractor on the project for many of the reasons cited above - I'll overview the whole team in another post.  I hope you can see through this narrative the many ways stones have appeared on the path as I have continued forward, uncertain of where I might need to tread next but consistently feeling supported along the way.

So NOT a linear path!  So cool to flow with it, and experience the relentless opportunities to ask, when an unexpected moment happens, and answer the question "is this something to push on or to breathe into?" moment by moment...

A little bit about this Deltec Home

 

This picture is what inspired the version of Deltec home I am creating - minus the christmas tree and snow, of course!  Deltec's unique manufactured shell in a round design is super popular on the east coast, particularly in areas where there are hurricane winds as this structure withstands that while others are meet a more destructive fate.  They make them from 500-2500 sq feet and people sometimes stack them to make multiple stories or connect them to make a distributed space or add on things like square garages or "wing" rooms.  I chose a 1000 sq ft model, after all it's only me!

The unit I'm using has 14 panels to create the exterior walls.  I worked with Deltec to think into the overall floor plan, how I imagine using the space and finalizing what each panel would include, be it a window, door, or solid for shear wall requirements - this structure requires one shear wall per quadrant.  Deltec's project managers, designers and engineers were fabulous to work with and helped me hone a vision into something that could work.  It will come as no surprise that I've modified that original intention many times in many ways small and large, and that process will not end any time soon, I'm learning!     

Plenty of steps in preparation but ultimately this is what will be happening.  Deltec manufactures the panels and roof trusses and puts them in a truck and sends them to the house site here.  A local crew assembles the shell on site, and that can happen within about a week.  Super appealing to have that structure up and enclosed so quickly, after that it's all finish work.  

I choose the roof extensions to create a covered entry/patio and another on the opposite side.  I hope it makes it look a little less like a yurt, which is what everyone sees when they look at the images of it.  


And this is the basic layout.   Entry is at the 5:00 position if you know what I mean.  The right side is all open living/kitchen/dining area and the three "centered" panels on the right are huge 6x6 windows.  The walls are 9' high and they go up to an apex at 13' at the center.  Using cedar tongue and groove wood for the ceiling and the centerline wall does not go to the ceiling, it's capped at 9'.  The only walls that go to the ceiling enclose the bathroom.

I've picked out all the materials, chosen the colors, appliances, you name it, I'm ready to build this thing!  Oh, yah, that doesn't matter, it turns out there's a process that doesn't even remotely map to my image of how it might go.  Beginner's mind activated, surrender required, relentlessly.  I'm loving every single thing about it.....how fortunate am I.