Thursday, April 25, 2024

Gliding toward completion - and we're ahead of schedule!

It's definitely the down swoosh on the roller coaster ride now!

Adaptation R Us...continued.  I can't recall if I shared that the intended ceiling for the house is a tongue and groove wood, in 14 bays/pie wedges of the house architecture.  That feature is something I have enjoyed in my friend KT's house and was a big part of my vision for my home and what I would be experiencing living in it...and then there's reality.

Getting to the point of working on that and deciding on materials, etc...it became clear that the cost of wood and labor to do it would be around $30,000.  That made it a hard no.  Took a minute to adjust the vision and expectation around that and pretty quickly came to an alternative.  I was attracted to the idea of doing box beams on each of the hip trusses.  I thought at least that would give an echo of the infrastructure above it (which we all wish could be visible!) without the same investment in materials or time.  After creating a mockup of the faux beams, it became further apparent that even that much wood would feel weighty, that the size of my home was too small for that to not feel heavy, bring the ceiling down as it were.  

So we landed on a final compromise...we put trim at each of the hip trusses that will be painted the same color as the ceiling - so we get the effect without the bulk.  Painting them vs staining or leaving them as raw wood I hope will make it less wagon wheel-y.  Here's a glimpse of it in progress and what it's like at the center:


 

I'm pretty pleased with it...and who knows, maybe some day if I get a sufficient infusion of resources I'll put the tongue and groove wood in!  We also put trim on the tops of the walls which will also be painted just to give that a more finished look.

The other big push forward this week is the flooring arrived and is being installed!   First, they put down a liquid, self leveling compound.  Pretty wild stuff, it finds imperfections and dips in the slab and fills them in, creating a truly level surface to work with.  It dries over night and then they lay down the flooring.


 

I love it...so happy it looks how I hoped it would given, again, you look at a piece of sample and try to envision a room of it...so far, so good!  This is in the entire house except the bathroom where there will be porcelain tile.  That work starts next week.

So...today my contractor exclaimed, as if surprised himself, "we are ahead of schedule!" 

Thursday, April 18, 2024

White no more!

Been waiting for more obvious change to be apparent to share an update.   The crew that did the drywall, tape and texture have completed their work.  It was really cool to watch - and again, everything done BY HAND.  This guy did the entire texturing job himself!  Check out the results..




Next the painting crew came in and primed the entire house:

SERIOUSLY white at this stage!!!

Then, the color went on...a first coat throughout and they'll come back and do a second when everything's installed. Me likey!!!




Making even more changes as reality meets the imagined...all livable and, in some cases, an improvement over the original thought...stay tuned!




Friday, March 29, 2024

The whitest my home will ever be!

I may not have been explicit about this before now but, there is NO white in my house design, anywhere,..except the A/C split units which is kind of unbelievable that given their popularity, they haven't really begun to make them in other colors than white!  The good news, however, is that I've designed a screen for them that will almost make them disappear in the space.

I digress...my point is, there isn't any intentionally chosen white anything in the entire house.  So this current moment is pretty wild, and pretty extreme.  The interior is sheetrocked and voila, the most white you're ever gonna see in the place!!!







Tape and mud are next, then texture which will happen next week.  The first coat of paint goes on after that and then we build the faux beams and light trough and it flows from there.

I'm giving my landlords 90 days notice with this next month's rent.  😬  Can you say things are getting REAL?!!!  Pretty awesome. 
 

Monday, March 25, 2024

Goodbye trusses!

 Lots of things have happened in the past week...

The front door frame was installed with a temporary front door.  I'm having an etched glass front door made so it'll be the last thing to go in.   On Friday of last week, my contractor and I went to a reclaimed goods business in the area and hit paydirt.  I was able to source a pre-hung wood door in beautiful condition for the second room/zen den, louvered swing doors for the laundry room (louvered required, to vent the hot water heater), and two solid core pocket doors and the pull hardware for them...all for under $300!!!  That's how we roll...💪🏽

The door being installed allowed the final siding to go on that panel, and all the trim is pretty much done too.  The sheet rock team did all the exterior work first, putting the necessary fire rated material into the porch roof extensions, and they'll finish the soffits this week.  

So an interesting development discovered by the sheet rock team...when they went to look at the roof trusses for adhering the drywall, they discovered some of them were bowed a bit.  An easy fix by sistering some wood along the trusses but interesting because when Jeff was here, (the guy I brought in to lead the shell arrival and assembly) he told me a story of a project he helped out with when they had an issue that kept them from completing their assembly and it had to do with a torque on the roof trusses - caused by the hold down process - can't recall if it was doing something out of sequence or too tightly or what but I think that's what happened in this case.  It's a micro measurement of deviation from norm and has no structural vulnerability associated with it, but it mean a couple of days of hammering wood onto the trusses.

The ceiling is coming along...bye bye trusses!


Another issue that needed solutioning this week had to do with the venting plan for the kitchen.  My vision has never included range hood that vented out through the ceiling...always wanted to keep the open nature of the ceiling.  California has energy efficiency regulations, Title 24, and CalGreen which are monitored and the fulfillment of which is signed off on by an energy engineering firm...yes, I had to hire them to provide a checklist of what was required to comply with the regs and to do two inspections, one at close-in and the other at final.  So the CalGreen peeps told my contractor on Monday that the regs do NOT allow ductless venting any longer...he reached out to me on Monday afternoon at 4p to let me know we had to figure out a way to vent outside.   This comes AFTER we have sprayed the insulation into the ceiling - not great no matter what but really shitty timing to get told that!

I was not convinced...I had done my due diligence before we even drew up plans, I knew there was a way for this to work but looking at the regs, a classic case of in one area it describes situations where it's allowable and another area says things that suggest it's not...clear as mud. We met at the house first thing on Tuesday morning, and the HVAC contractor came too to add to the creative mix.  I had gone down to the house on Monday evening with Buzz and Jean to look at it and see what options could be livable that don't go through the ceiling.  The least offensive approach we agreed was to do a wall mounted vent, and duct out to the exterior but encase it in a soffit and run that soffit on the whole wall length for symmetry.  

After that exploration, I got to sleuthing the official word on the regs, and I found all the references needed and reached out to the energy engineering firm and got THE GUY who could definitively say what's possible.  He concurred, it is allowable to have a recirculating hood vent IF there is another exhaust system in the kitchen (there are different regs for enclosed and open plan kitchens as well, of course!).  That meant all we would need to do is get an exhaust fan that met code - minimum 300 CFM - and we were in business, I could have the ductless vent hood!

I sourced the code-satisfying units for both the hood and the exhaust fan and the only thing we'll need to do is pop out a piece of the siding for a 10x10 fan and we are good to go!  PHEW.

Everything that's happening now is adding heft, so to speak - the house is beginning to feel like one vs a construction project.   Super fun to watch happen.  Super grateful.




 

 

Thursday, March 14, 2024

In we go!

One quick trip to the County Permit offices when I returned from DC with the exemption form in hand and the sprinkler requirement was vanquished!  The close-in inspection happened on Tuesday of this week and we passed so we are clear for interior work to proceed apace!

Here's what the interior looked like in preparation for the inspection - all the equipment has been moved out (well almost all) and you can really get a sense of space, anew. 






This morning, the insulation team showed up.  They laid plastic down on the entire place and covered any exposed windows.  They sprayed isoprene into the trusses in the ceiling - code requires they're covered at least 6 inches down from the roof.  Check it out!









When I checked in this afternoon, the guy in the paint suit was spraying a fire retardant paint onto the insulation, covering the entire surface, again.  The paint is kept active by stirring it up and feeding the pump.



A second team showed up so it let them complete ALL of the insulation in one day - they did the batt insulation in the walls as well:

 

The front door frame, and a temporary door, arrive on Monday as does the sheetrock for the interior!  Drywall install starts next week and will be about a week to complete, inclusive of taping, mud and cat scratch finish.  

We assembled a go forward schedule today - knowing full well timing can be mythical - but at this juncture, things are a lot more reliable.   Here's the hoped for sequence of events:

March 18 & 25 week - Drywall install, front door install and final trim on exterior

April 1 week -Finish patios, Paint prime and one cover coat throughout

April 8 and 15 week - build box beams and light troughs and install

April 22 week - Flooring, potentially bathroom tiling

May 1 week - cabinet install, final plumbing, elec and mini-split installs,

May 6 week - countertops install, sinks, insinkerator, under counter water chiller, appliances in

And none of this speaks to the septic system that needs to be installed and the carport and solar that have to be completed before the County will sign off on the building permit...always more to deal with!!!!

It's a good thing.

 

 

 

 

 

Monday, March 4, 2024

Rough...and not quite ready


Been a minute, I know...I was away all last week, and, a fair bit has transpired since I last posted.

The house is ready for a "rough in" inspection.   This check on all the infrastructure precedes insulation and then drywall.   It was to have taken place a week ago Friday.  I was at the airport awaiting boarding my flight that morning when my contractor pinged me and asked if I could talk.  Turns out the inspector won't do the rough in inspection because, yes, there's another stamp on the plans that's in the way.

So this falls into the category of the roadmap not being available or transparent.  When we got the plans, you may remember there were a bunch of stamps on it.



This time the nemesis is the stamp placed by the Fire code enforcement folks which says Fire Sprinklers are required.  They're not.  Fortunately, back in 2017 when the first big fire storms hit the State, we had a piece of legislation passed in support of rapid building and rebuild of housing that exempts ADUs of less than 1200 sq ft from the sprinkler requirement if the existing structure on the property is not required to have them.  That is the case in this instance, but it seems to be that the County is saying "prove to us you don't require them and are exempt" vs them checking in the first place and not putting this requirement on the permit. 

When we received this, I noted that and knew that I would need to clear it up before getting final sign off.  Silly me.  It turns out it needs to be cleared up NOW because naturally an inspector who sees that on the plans won't do the rough in inspection if sprinklers haven't been installed.  An amusing side note of nostalgia on all this...the legislator who put this into motion is Bob Wieckowski, with whom I worked while on staff at Congressman Don Edwards' office, who is a Fremont home town guy who ultimately got elected to City Council and is now State Senator.  Thanks Bob!

Getting this news as I'm getting on a plane meant that it couldn't be dealt with for a week - so everything's been pushed back until I returned and I'm going to the County tomorrow to clear it up.  😒  So much for my get out ahead of it strategy!  The working assumption now is if I can get that taken care of tomorrow, we'd have the rough in inspection by the end of the week and get insulation set up for next week.  🤞🤞🤞

In the meantime, trimmings have been proceeding at the house.  The big double doors are all installed!  Made some last minute switch ups in the plan on that but, it all worked out great.

The installation of the doors allows for the siding to be installed on those panels, it all looks so much more intact now!  The one set of doors that is white didn't come in the same trim color but I got the paint formula for the trim and it'll be painted to match outside and the inside will be painted to match the interior walls...pretty sweet.

It's cool to see and experience the space with all the light that the doors provide!  It's becoming!

Doors from kitchen out to covered patio

Doors in my bedroom
Doors in the bathroom...the shower will be what's in front of those doors.
 

While I was away this week I was able to make progress on a bunch of things...things that I've been noodling on and carrying mentally for a long time...so happy to have these off my "to do" list!  First of all, the local appliance store, Asien's, that has been in business here for decades, shuttered abruptly and unexpectedly two weeks ago.  I had quotes from them for my fridge, cooktop and dishwasher and fortunately, did not have an order placed with them - lots of other people are way more stuck than me with this development.

I immediately got to sourcing alternatives and boy did I get lucky!  I was able to get my dishwasher, fridge and washer/dryer tower from a wholesale outlet saving over $2500!  And I got my cooktop from a place in NY that saved me about $600 so feeling pretty good about where all that landed.  Not only that, but they'll hold the appliances until I'm ready for them...wohoo!

I also found a hot tub!  Super excited about landing this deal...my hot tub lifestyle makes that element a necessary one for my well being.  The one I've had since 2008 has done its time, I've moved it twice and I don't think it can withstand another move.  Getting another one, however, is a sticker price shocker to say the least.  I managed to get connected to a shop near me that takes hot tubs when people swap them out/upgrade and they replace all of the electronics, put in a new pump and ozonator and give you a fresh lid and new chrome jet covers...basically rebuild the thing, and sell them for half their retail price.  I found the perfect unit, in a price range I could say yes to AND they are giving me money for mine and taking it away to boot!  SCORE!

On a good trajectory - keeping the process flowing...working next on the carport design, and finalizing the etched glass front door purchase....we are on a ROLL!





 



Monday, February 12, 2024

WIRED!

I was in Seattle last week so wasn't on site for the day to day progress but truthfully, it's all been electrical.   Alex with Denny's Electric (the guy I shut into the house!) has been amazing.  Once again, things are way more complicated and involved than I could ever imagine - and his skill and competency are pretty awesome to witness - super glad he's on the team!

I honestly don't feel like I have that much going on in this little space and yet, you'd never know it from the wiring!  Wires through the walls, strung through the trusses in the ceiling, within the wall structure, you name it.   




I'm not doing any install of media wiring, choosing to keep things simple. I'm not wiring for sound, internet or cable.  I am likely to use Starlink (have to make peace with giving Elon Musk's company money...not starting there but preparing for what may be inevitable for connectivity in this rural area) and the blue chaser in this image is the infrastructure to support that when/if I install it.

Next is the rough-in inspection and then we get to do insulation!  The doors arrived last week so they'll get framed in and then they can complete the siding on those panels as well.  If we are successful with an inspection this week, insulation should happen within the week and then drywall last week of the month!


 

Sunday, January 28, 2024

Moving swiftly - and it had consequences! 🤦🏽‍♀️

This week was a rapid succession of lots of little and not so little things.

The A/C splits were roughed in...the plans had called for ceiling mounted units which would have been really much more aesthetically pleasing than white boxes on the walls..however, it turns out you can't install ceiling mounted units on a sloped ceiling.  So, we pivot to wall mounted units, of different BTUs in each location...6k for the Zen Den, 9k for the bedroom and 16k for the living space.  Another letting go, adapting moment!

There will be one condenser outside for all three units.

Met with the electrician to finalize the install plan.  Learned that the materials and install cost for the interior perimeter lighting I had hoped to utilize was $8700 so we won't be doing that!   We have a DIY alternative that will suffice, and we validated where all the switches and outlets would be and I got to pick the face plate color!  Wohoo!   Going with Ivory, FYI.

The plumber realized that the hybrid hot water heater required both venting and pan drain that he had anticipated putting through a wall that is drawn into the plans but will ultimately have the murphy bed in it, so plumbing can't run through it...that glitch is a function of the County's seeing that room as a bedroom and requiring, hence, an egress, but we can't make that happen cuz the exterior walls were already built and can't be modified.  So we built a solid wall where the murphy bed will go and will install it after we get our final clearance on the building permit.  Yes, these are the machinations that go on constantly.  They had to cut into the slab to run a line out of the house under the rebar...kinda painful to see because as you may have seen in earlier posts..that slab was perfection.  It's not a consequential thing and can be easily remediated but it's the fact of it, that it had to be cut into.  Anyway, in the course of all that sorting out, we realized we could save on the venting system by having louvered doors on the laundry room  - if you have louvered doors a vent is not required, so that was a good catch!

Met with the cabinet maker, and refined the cabinetry plan - so great to have the benefit of those who know and have vision beyond my thinking.   Shifted a couple of things and confirmed measurements.  Really like where we ended up, waiting on that estimate.

Found a sink!  I have wanted to use reclaimed materials as much as is realistic and was out and about on Friday and went to one of the sources for reclaimed goods and found the perfect kitchen sink, a pretty high end brand that was unused, color perfect and I got it for half its original price.  Yay!

That day I also just stopped in at Home Depot to grab an additional sample of my Cesarstone quartz countertop I'm using and saw it was at a lower price than my original estimate and there was a 10% off promotion that expired the next day so made that purchase too!

Next week the electrical work will get done and we move on to insulation.  Will do a walk through with the electrician on Monday to confirm all the switch and outlet locations.   Here's a funny story that prompted the 🤦🏽‍♀️ in the post title....I stopped by the house on Friday to drop off the rain chains that were delivered so the roofer could install them.  When I went in, Alex, the electrician doing the work was there, I met him and then I left.  Later that afternoon I had a meeting with Joe at Denny's Electric (the owner) and he told me that Alex called him because I LOCKED HIM IN!  I seriously cannot believe I did this but when I got there the door was closed, so when I left I robotically made sure I closed it, and latched it!  Oy gevalt.



Helluva way to meet the owner eh?!!  Sheesh....a reminder to slow down, for sure.

 

Sunday, January 21, 2024

She has a chapeau!

Abel Martinez, the roofer, and his team have at last completed their task with the metal roof installation!  They were to have started the week of December 18, and taken a few days, but construction issues and the weather have drawn this job out inordinately long.   I'm grateful for their persistence and dedication to the quality job they've done.



They work rain or shine, and to watch them scamper around that slick metal roofing is a tad unnerving I must say!  They use several different resources that keep them from sliding down the panels, amazing to watch and it's evident they pitch their bodies in angles to the roof line that support balance, etc...such skill.

They fashioned a sweet little cap to the roof - the house was to have had a more substantive cupola, a feature I looked forward to but have abandoned.  Initially the plans called for batt insulation in the ceiling which requires venting and the cupola would have been a part of that venting system.  I have since decided to do spray isoprene insulation in the ceiling - it's a tad more expensive but it eliminates venting, which is an even more fire safe choice. That, along with the labor involved in constructing the cupola, and the equipment that would have been required to mount it...for something purely aesthetic, nope.  So instead I get this sweet little feature they made for me at the top:


The only task that remains is to install the rain chains I'm using in lieu of downspouts...that'll happen within the week.

Inside...plumbing is just about done!


 

Electric work begins this week so things are moving at a pretty consistent pace....

My prediction, and my mental adaptation I'm doing at the moment, is that the house will likely be completed but I will not be able to occupy it because it's highly probable the septic system would not get in before that time...we are having SO MUCH rain here.  Much needed and it is the determiner of when the septic can be installed...so yah, I can foresee the house in a state of readiness to be final inspected but not be able to until nature allows the septic system to get in. 

Just sayin'.....there's little that's reliable with respect to timelines and timeframes!