Countdown Clock has Begun!

June 30 is the target....things are lined up pretty well for it all to fall into place, so far!

Solar is complete, and up and running!  Beyond the install of the components, it involved interconnectivity with PG&E, internet to be active, and I'll get a walk through shortly on it all but here's the final product...

Electric came back and installed all of the fixtures, ceiling fans, vanity mirror, switches, Starlink internet, and completed the breaker box: 
That picture is a great visual for how NOTHING is as simple as I think it is in this construction!

This week the septic system work continued.  We passed the seal tight tank inspection.  The pump and its control panel were installed and the final Septic Electric inspection happens this coming Tuesday.   

The leach line work continued, and on Monday there will be, of all things, a squirt test!  This system pumps effluent up from the tanks near the house to the leach field on the hillside, and then monitor wells are dug along the leach lines and the distribution system has controls that dictate which of the lines the system uses, etc.   The test involves activating the pump and confirming that all of the designated outlets push water out to 36" high! All that gets tested on Monday.




Lastly, but not least, the cabinet maker, Thomas Loos, came by and installed the shelves above the cabinetry in the kitchen.  That was needed to be able to mount the hood vent and finish the lighting that will go under the lower shelves.  This gives you a feel for the filling in going on:

Everything is staged for a big surge of activity scheduled for next week:

Monday:  Countertops install (kitchen and bathroom), including sinks and cooktop

Tuesday: Appliance install, plumbing installs and hookups (toilet, sinks, faucets, hot water heater etc), completion of the A/C split system (install compressor on the exterior).  With that work completed this week all that will remain is the final coat of paint and cabinet covers/doors installed with their drawer pulls.  Did I mention already that I have a friend who is an avid collector of things with imagination about their future use...having lunch a week or so ago I mentioned the only thing I hadn't yet sourced was the drawer pulls for the cabinets and he said he had some.  I went to his studio/storage and sure enough he has exactly the number I need of the ideal drawer pulls!  Grace, yet again....  

The moving in part won't be one big pack and drop.  I'm planning to bring into the space the larger pieces I'm moving - sofa, chairs, armoire, etc - to evade messing up the paint job on the move during the week of the 17th.  I only have about 8 bins of things in addition to that so I'll likely migrate all that over as well and keep it in the center of the room(s).   The painters are coming the week of June 24 and I'll make the last haul of things over at the end of that week without packing, just transferring so to speak.  I'm only going 2 miles down the road!

On a different but related note...this week I was invited to join my friends Pam Jones and Steve Herskovitz on a 2-hour private plane flight over Sonoma County - they'd won it at a fundraising auction last year and just now got to doing it.  It was a glorious clear morning here and we had a fabulous flight - the Healdsburg Airport is directly across Dry Creek Valley from where I will be living, so on takeoff we buzzed our current homes on Brack Road (they're my neighbors across the road) and my new place...here's a snap of the house in it's context - see if you can spot the conical roof!


 Life continues to be my ally....for which I remain deeply grateful.

Saturday, May 25, 2024

Septic and Solar Reign

 BIG week of activity....a story in three parts:  Septic, Solar, and Trim/Carpentry

Septic system - seriously!


Father and son, await the delivery of the tanks...so patiently.  Actually, we joked about how this is them, stressed.  Trust me, you'd never know it.

The tanks came on a truck that has a boom crane on it...each tank is 1000 gallons...like I'd ever fill that up! 😂



As usual, impressive equipment and skillful people...






They dropped in perfectly, level and at elevation! 

This is them not stressed any more!

 

Next, they set about to make the connections needed between the house waste water pipe to the tanks to each other and out to where the leach field will be.  The green spouts on the tanks will be cut down once the earth is graded around and over them, FYI!




 

An inspector came out and declared the necessity of doing a test of the tanks that involves filling them both to capacity, and watching for any drop in water levels.  Given that required 2,000 gallons of water, it had to be trucked in!





You also have to make sure the tanks won't float with water around them!   Everything is set for the inspector to validate next week.   Septic system status ✅  To be continued...

On the Solar front...miracle of miracles, Pure Power Solutions who is the local purveyor of solar - I know the owner and some peeps who've worked with them, hence the choice of them as vendor - they had an opening in their calendar for this week and hopped on it to get the solar installed.  That happened on Thursday and will be completed after the holiday weekend on Tuesday.

The team that showed up included the first, and only, female on this job since its inception!  Danielle and Justin were a cool crew to watch work - methodical, lots of care taken, and a clear indication of safety as a priority - twas awesome to observe.

That's Danielle at the apex of the roof!
 

We made yet another improvement in the solar plan...their field work suggested it was possible to put all 5 panels on the three sections of the roof you see in the pic above.  The plan was for a couple to go on the roof extension to the left, which would have been mounted at an angle vs flush on the roofline.  Now, all 5 panels will be flush mounted, love the change!


 If you've been tracking in any detail, there are a couple of things you might notice in the last image above.  Not only is the solar infrastructure there, but the rakes have had siding put on them, no longer the yellow bits that have stood out up until now.  And, the contractor's team is DONE with their work, so all of the equipment and surplus materials have been removed from the house, and the site!  

All that's left is countertops, HVAC final compressor install, hot water heater and fixtures and the electrical fixtures...all on deck to happen in the next couple of weeks...still on track to be in there by June 30! 😅

Saturday, May 18, 2024

Septicsational!

It's finally happening...the septic is getting installed!!!  A short recap....I was granted permission to build the house without the septic completed, a very unusual permission, last year given the delay in septic happening was due to understaffing in the permit department.   The permit was finally approved in October and we were ready to go but then the rains started, and we could not dig...until now.  

The man, Jeff Caspersen, who knows where every septic system is in this valley, came back to work...he'll be both installing the system and doing the final grading around the house.  A strange discovery, however, was that the roll of fabric/material used in this task that had been lying on the ground since the work paused last Fall was nowhere to be found.  There is no story line about that that makes sense.   It's a 12' long roll, weighs about 150 pounds and no other trade on the job uses this material so how it managed to get off site will forever be a mystery.   We have been fortunate throughout this job that nothing has disappeared nor has there been any reason to imagine needing to be overly cautious about it.  I mean, if someone was going to lift stuff from this site there's a lot of expensive equipment and supplies everywhere!  So, we move on....

Jeff and his son got to work...first he covered the entire territory with his equipment to both get the tall grasses down and remove the waddles that had been in place for erosion protection during the rains.  Next, he laid out the placement of the two tanks.


 Then the digging began...man in the hole!!!



 No, son is not trying to bury the father...😂


 And, the final result..two spaces awaiting tank delivery next Tuesday:

 

Another big development, and resolution.   It's been a trying couple of weeks mentally and emotionally...as the finish line nears, I recognize my anticipatory energy and my project management self that likes to see and know that everything's gonna weave into completion smoothly gets amplified...because, after all, it's all about sticking the landing!  And, nothing about this kind of project goes that way so yet again, I hit a wall and was compelled to surrender, yet again, to reality and make some shifts in what I've imagined about how things would go...and, all's well and actually set up even better than my delusions envisioned.

In the lane titled "so much about this process is opaque," it became incandescently clear a week ago that in order to have my building permit finaled, the solar permit has to be finaled.  Solar power is required by law with new builds in California and Title 24 regulations dictate the scale of system minimum requirements.  I had intended to build a carport and put solar panels on it at a scale beyond the minimum that would have generated not only more power, but feed back into the grid, and I was going to get a battery for backup during power outages.  

We filed the permit application in November and it still has not cleared.   In addition, the costs to complete the house are predictably greater than I anticipated and I hoped to punt the solar project to later in the year to ease the financial burden now, but nope, that won't work.   Exploring options and pulling the solar, electric and contracting team together, we arrived at a solution vastly different from what I hoped to do, and it will be sufficient and satisfactory to get the building permit finaled, and likely in the month of June to boot.

The original plan was going to be a 7.4kw system, but instead, we're doing a little over the minimum requirement which was 1.7kw, and I'm installing 2.1kw.  I'm putting 5 panels on the roof of my house, which will be a lower infrastructure cost as well.  The good news all around is it's more affordable, I can expand later when I have the resources, the permit for this type of system can be issued in 24 hours and they're installing it all the week of Memorial Day!  One less obstacle to building permit final happening as soon as is feasible.

So, all that said, on track to migrate in the month of June, and with the developments of this week, this could actually synchronize to stick that landing after all.  My life...awe and wonder.

 

Friday, May 10, 2024

Getting gorgeous

This phase is definitely fun...some of the work being done has big imprints, super noticeable and other things are less apparent, yet a lot of effort is being put into the little things at this stage.

The headline of the week was tiling the bathroom.  Such a cool process to watch happen.  The first thing that went down was the floor.

Precision tiling is more like it...Dennis Ward's team, inclusive of his son Danny, have been meticulous in all the ways you'd hope.   Straight lines, choices about where to put whole tile, where to cut, etc....next was laying out the shower floor tile.  They did a mock up and noticed predictable gaps of varying size between tile elements...so they checked with me about whether I'd be OK with that.   I knew it'd be the case...and when I went to go look at it and give the go ahead, I had a notion of what could mitigate the bigger gaps.


If you look closely, you might detect it.   A dear family friend, a peer to my parents, Debbie Ruth, shared with me a while back that she collects rocks.  She happens to collect heart shaped rocks, which I do as well.  She gave me a whole box of them, and I immediately knew they'd be the ideal thing to slip into the space...heart shaped rocks of many sizes, I culled through the stash and picked out ones that were small enough to be candidates and voilà!  The tile team loved the idea and set about to drop heart shaped rocks randomly around, so now, when you look down, there's the whimsical appearance of a heart at your feet!  😍

That's how it ended up...and here's the bathroom, complete, and drying: 
Light and shadow don't help in seeing it in a picture but it's so fabulous...again, another thing you choose from a paint swatch size of example and the relief when it all looks OK at scale!!!

You can see in that image that the vanity drawers were installed, same with the kitchen cabinets:

The facings go on last...and, today the cabinetry was measured for the countertops!  

Appliances arrived too:

Electrical will likely get worked in next week, while exterior trim gets completed and I believe the hot water heater is coming in as well...you can see the big equipment outside ready to install the septic system too...step by step!!! 



Friday, May 3, 2024

Fast Track to Finish(es)!

I wasn't kidding about the roller coaster....lots of things happening quickly, and it's a dynamic set of activities that get scheduled, then changed, then multiple things go on at the same time...you get the picture.  And, its ALL good!

The tile crew started their work on the bathroom this week...they laid down material for water protection on the walls and concrete slab, they mudded the pan for the shower, and we passed an inspection for all that.  



Trim work continued as well...the doors are all trimmed up ready for painting:


And the light trough that will cast light up onto the ceiling in the living area is installed too...great craftsmanship on the part of Francis and Steve on the contractor's team...


Today, a great gift, the cabinets were ready to be installed.  The infrastructure, mind you, the drawers and fronts will come later but these being ready now lets the templates for the countertops be measured two weeks ahead of what was anticipated. I chose to build them at 41" high, for this tall gal.  Thomas Loos, cabinet maker, is a rock star!

Kitchen...there's a gap on the wall side for the refrigerator...and the bathroom vanity:
Baseboards are arriving today so that will likely start up next week, tiling will be done in the bathroom,  On Friday, the appliances are delivered and the countertop templates are measured, with product to be delivered in about two weeks.   Like I said, Fast Trackin'!!!

We also had a meeting on site with the excavator who will do the site grading and install the septic system, and the geotechnical engineer (my brother in law) and my contractor to validate the next steps in earth work and clarify how we will use the spoils from the excavation for the tanks, etc...that work will start the week of May 13 so the prospects of having a septic permit finaled in June are going up by the day!