Saturday, May 25, 2024

Septic and Solar Reign

 BIG week of activity....a story in three parts:  Septic, Solar, and Trim/Carpentry

Septic system - seriously!


Father and son, await the delivery of the tanks...so patiently.  Actually, we joked about how this is them, stressed.  Trust me, you'd never know it.

The tanks came on a truck that has a boom crane on it...each tank is 1000 gallons...like I'd ever fill that up! 😂



As usual, impressive equipment and skillful people...






They dropped in perfectly, level and at elevation! 

This is them not stressed any more!

 

Next, they set about to make the connections needed between the house waste water pipe to the tanks to each other and out to where the leach field will be.  The green spouts on the tanks will be cut down once the earth is graded around and over them, FYI!




 

An inspector came out and declared the necessity of doing a test of the tanks that involves filling them both to capacity, and watching for any drop in water levels.  Given that required 2,000 gallons of water, it had to be trucked in!





You also have to make sure the tanks won't float with water around them!   Everything is set for the inspector to validate next week.   Septic system status ✅  To be continued...

On the Solar front...miracle of miracles, Pure Power Solutions who is the local purveyor of solar - I know the owner and some peeps who've worked with them, hence the choice of them as vendor - they had an opening in their calendar for this week and hopped on it to get the solar installed.  That happened on Thursday and will be completed after the holiday weekend on Tuesday.

The team that showed up included the first, and only, female on this job since its inception!  Danielle and Justin were a cool crew to watch work - methodical, lots of care taken, and a clear indication of safety as a priority - twas awesome to observe.

That's Danielle at the apex of the roof!
 

We made yet another improvement in the solar plan...their field work suggested it was possible to put all 5 panels on the three sections of the roof you see in the pic above.  The plan was for a couple to go on the roof extension to the left, which would have been mounted at an angle vs flush on the roofline.  Now, all 5 panels will be flush mounted, love the change!


 If you've been tracking in any detail, there are a couple of things you might notice in the last image above.  Not only is the solar infrastructure there, but the rakes have had siding put on them, no longer the yellow bits that have stood out up until now.  And, the contractor's team is DONE with their work, so all of the equipment and surplus materials have been removed from the house, and the site!  

All that's left is countertops, HVAC final compressor install, hot water heater and fixtures and the electrical fixtures...all on deck to happen in the next couple of weeks...still on track to be in there by June 30! 😅

Saturday, May 18, 2024

Septicsational!

It's finally happening...the septic is getting installed!!!  A short recap....I was granted permission to build the house without the septic completed, a very unusual permission, last year given the delay in septic happening was due to understaffing in the permit department.   The permit was finally approved in October and we were ready to go but then the rains started, and we could not dig...until now.  

The man, Jeff Caspersen, who knows where every septic system is in this valley, came back to work...he'll be both installing the system and doing the final grading around the house.  A strange discovery, however, was that the roll of fabric/material used in this task that had been lying on the ground since the work paused last Fall was nowhere to be found.  There is no story line about that that makes sense.   It's a 12' long roll, weighs about 150 pounds and no other trade on the job uses this material so how it managed to get off site will forever be a mystery.   We have been fortunate throughout this job that nothing has disappeared nor has there been any reason to imagine needing to be overly cautious about it.  I mean, if someone was going to lift stuff from this site there's a lot of expensive equipment and supplies everywhere!  So, we move on....

Jeff and his son got to work...first he covered the entire territory with his equipment to both get the tall grasses down and remove the waddles that had been in place for erosion protection during the rains.  Next, he laid out the placement of the two tanks.


 Then the digging began...man in the hole!!!



 No, son is not trying to bury the father...😂


 And, the final result..two spaces awaiting tank delivery next Tuesday:

 

Another big development, and resolution.   It's been a trying couple of weeks mentally and emotionally...as the finish line nears, I recognize my anticipatory energy and my project management self that likes to see and know that everything's gonna weave into completion smoothly gets amplified...because, after all, it's all about sticking the landing!  And, nothing about this kind of project goes that way so yet again, I hit a wall and was compelled to surrender, yet again, to reality and make some shifts in what I've imagined about how things would go...and, all's well and actually set up even better than my delusions envisioned.

In the lane titled "so much about this process is opaque," it became incandescently clear a week ago that in order to have my building permit finaled, the solar permit has to be finaled.  Solar power is required by law with new builds in California and Title 24 regulations dictate the scale of system minimum requirements.  I had intended to build a carport and put solar panels on it at a scale beyond the minimum that would have generated not only more power, but feed back into the grid, and I was going to get a battery for backup during power outages.  

We filed the permit application in November and it still has not cleared.   In addition, the costs to complete the house are predictably greater than I anticipated and I hoped to punt the solar project to later in the year to ease the financial burden now, but nope, that won't work.   Exploring options and pulling the solar, electric and contracting team together, we arrived at a solution vastly different from what I hoped to do, and it will be sufficient and satisfactory to get the building permit finaled, and likely in the month of June to boot.

The original plan was going to be a 7.4kw system, but instead, we're doing a little over the minimum requirement which was 1.7kw, and I'm installing 2.1kw.  I'm putting 5 panels on the roof of my house, which will be a lower infrastructure cost as well.  The good news all around is it's more affordable, I can expand later when I have the resources, the permit for this type of system can be issued in 24 hours and they're installing it all the week of Memorial Day!  One less obstacle to building permit final happening as soon as is feasible.

So, all that said, on track to migrate in the month of June, and with the developments of this week, this could actually synchronize to stick that landing after all.  My life...awe and wonder.

 

Friday, May 10, 2024

Getting gorgeous

This phase is definitely fun...some of the work being done has big imprints, super noticeable and other things are less apparent, yet a lot of effort is being put into the little things at this stage.

The headline of the week was tiling the bathroom.  Such a cool process to watch happen.  The first thing that went down was the floor.

Precision tiling is more like it...Dennis Ward's team, inclusive of his son Danny, have been meticulous in all the ways you'd hope.   Straight lines, choices about where to put whole tile, where to cut, etc....next was laying out the shower floor tile.  They did a mock up and noticed predictable gaps of varying size between tile elements...so they checked with me about whether I'd be OK with that.   I knew it'd be the case...and when I went to go look at it and give the go ahead, I had a notion of what could mitigate the bigger gaps.


If you look closely, you might detect it.   A dear family friend, a peer to my parents, Debbie Ruth, shared with me a while back that she collects rocks.  She happens to collect heart shaped rocks, which I do as well.  She gave me a whole box of them, and I immediately knew they'd be the ideal thing to slip into the space...heart shaped rocks of many sizes, I culled through the stash and picked out ones that were small enough to be candidates and voilà!  The tile team loved the idea and set about to drop heart shaped rocks randomly around, so now, when you look down, there's the whimsical appearance of a heart at your feet!  😍

That's how it ended up...and here's the bathroom, complete, and drying: 
Light and shadow don't help in seeing it in a picture but it's so fabulous...again, another thing you choose from a paint swatch size of example and the relief when it all looks OK at scale!!!

You can see in that image that the vanity drawers were installed, same with the kitchen cabinets:

The facings go on last...and, today the cabinetry was measured for the countertops!  

Appliances arrived too:

Electrical will likely get worked in next week, while exterior trim gets completed and I believe the hot water heater is coming in as well...you can see the big equipment outside ready to install the septic system too...step by step!!! 



Friday, May 3, 2024

Fast Track to Finish(es)!

I wasn't kidding about the roller coaster....lots of things happening quickly, and it's a dynamic set of activities that get scheduled, then changed, then multiple things go on at the same time...you get the picture.  And, its ALL good!

The tile crew started their work on the bathroom this week...they laid down material for water protection on the walls and concrete slab, they mudded the pan for the shower, and we passed an inspection for all that.  



Trim work continued as well...the doors are all trimmed up ready for painting:


And the light trough that will cast light up onto the ceiling in the living area is installed too...great craftsmanship on the part of Francis and Steve on the contractor's team...


Today, a great gift, the cabinets were ready to be installed.  The infrastructure, mind you, the drawers and fronts will come later but these being ready now lets the templates for the countertops be measured two weeks ahead of what was anticipated. I chose to build them at 41" high, for this tall gal.  Thomas Loos, cabinet maker, is a rock star!

Kitchen...there's a gap on the wall side for the refrigerator...and the bathroom vanity:
Baseboards are arriving today so that will likely start up next week, tiling will be done in the bathroom,  On Friday, the appliances are delivered and the countertop templates are measured, with product to be delivered in about two weeks.   Like I said, Fast Trackin'!!!

We also had a meeting on site with the excavator who will do the site grading and install the septic system, and the geotechnical engineer (my brother in law) and my contractor to validate the next steps in earth work and clarify how we will use the spoils from the excavation for the tanks, etc...that work will start the week of May 13 so the prospects of having a septic permit finaled in June are going up by the day!

Not a bad way to head into the weekend....



Thursday, April 25, 2024

Gliding toward completion - and we're ahead of schedule!

It's definitely the down swoosh on the roller coaster ride now!

Adaptation R Us...continued.  I can't recall if I shared that the intended ceiling for the house is a tongue and groove wood, in 14 bays/pie wedges of the house architecture.  That feature is something I have enjoyed in my friend KT's house and was a big part of my vision for my home and what I would be experiencing living in it...and then there's reality.

Getting to the point of working on that and deciding on materials, etc...it became clear that the cost of wood and labor to do it would be around $30,000.  That made it a hard no.  Took a minute to adjust the vision and expectation around that and pretty quickly came to an alternative.  I was attracted to the idea of doing box beams on each of the hip trusses.  I thought at least that would give an echo of the infrastructure above it (which we all wish could be visible!) without the same investment in materials or time.  After creating a mockup of the faux beams, it became further apparent that even that much wood would feel weighty, that the size of my home was too small for that to not feel heavy, bring the ceiling down as it were.  

So we landed on a final compromise...we put trim at each of the hip trusses that will be painted the same color as the ceiling - so we get the effect without the bulk.  Painting them vs staining or leaving them as raw wood I hope will make it less wagon wheel-y.  Here's a glimpse of it in progress and what it's like at the center:


 

I'm pretty pleased with it...and who knows, maybe some day if I get a sufficient infusion of resources I'll put the tongue and groove wood in!  We also put trim on the tops of the walls which will also be painted just to give that a more finished look.

The other big push forward this week is the flooring arrived and is being installed!   First, they put down a liquid, self leveling compound.  Pretty wild stuff, it finds imperfections and dips in the slab and fills them in, creating a truly level surface to work with.  It dries over night and then they lay down the flooring.


 

I love it...so happy it looks how I hoped it would given, again, you look at a piece of sample and try to envision a room of it...so far, so good!  This is in the entire house except the bathroom where there will be porcelain tile.  That work starts next week.

So...today my contractor exclaimed, as if surprised himself, "we are ahead of schedule!" 

Thursday, April 18, 2024

White no more!

Been waiting for more obvious change to be apparent to share an update.   The crew that did the drywall, tape and texture have completed their work.  It was really cool to watch - and again, everything done BY HAND.  This guy did the entire texturing job himself!  Check out the results..




Next the painting crew came in and primed the entire house:

SERIOUSLY white at this stage!!!

Then, the color went on...a first coat throughout and they'll come back and do a second when everything's installed. Me likey!!!




Making even more changes as reality meets the imagined...all livable and, in some cases, an improvement over the original thought...stay tuned!