Saturday, May 18, 2024

Septicsational!

It's finally happening...the septic is getting installed!!!  A short recap....I was granted permission to build the house without the septic completed, a very unusual permission, last year given the delay in septic happening was due to understaffing in the permit department.   The permit was finally approved in October and we were ready to go but then the rains started, and we could not dig...until now.  

The man, Jeff Caspersen, who knows where every septic system is in this valley, came back to work...he'll be both installing the system and doing the final grading around the house.  A strange discovery, however, was that the roll of fabric/material used in this task that had been lying on the ground since the work paused last Fall was nowhere to be found.  There is no story line about that that makes sense.   It's a 12' long roll, weighs about 150 pounds and no other trade on the job uses this material so how it managed to get off site will forever be a mystery.   We have been fortunate throughout this job that nothing has disappeared nor has there been any reason to imagine needing to be overly cautious about it.  I mean, if someone was going to lift stuff from this site there's a lot of expensive equipment and supplies everywhere!  So, we move on....

Jeff and his son got to work...first he covered the entire territory with his equipment to both get the tall grasses down and remove the waddles that had been in place for erosion protection during the rains.  Next, he laid out the placement of the two tanks.


 Then the digging began...man in the hole!!!



 No, son is not trying to bury the father...😂


 And, the final result..two spaces awaiting tank delivery next Tuesday:

 

Another big development, and resolution.   It's been a trying couple of weeks mentally and emotionally...as the finish line nears, I recognize my anticipatory energy and my project management self that likes to see and know that everything's gonna weave into completion smoothly gets amplified...because, after all, it's all about sticking the landing!  And, nothing about this kind of project goes that way so yet again, I hit a wall and was compelled to surrender, yet again, to reality and make some shifts in what I've imagined about how things would go...and, all's well and actually set up even better than my delusions envisioned.

In the lane titled "so much about this process is opaque," it became incandescently clear a week ago that in order to have my building permit finaled, the solar permit has to be finaled.  Solar power is required by law with new builds in California and Title 24 regulations dictate the scale of system minimum requirements.  I had intended to build a carport and put solar panels on it at a scale beyond the minimum that would have generated not only more power, but feed back into the grid, and I was going to get a battery for backup during power outages.  

We filed the permit application in November and it still has not cleared.   In addition, the costs to complete the house are predictably greater than I anticipated and I hoped to punt the solar project to later in the year to ease the financial burden now, but nope, that won't work.   Exploring options and pulling the solar, electric and contracting team together, we arrived at a solution vastly different from what I hoped to do, and it will be sufficient and satisfactory to get the building permit finaled, and likely in the month of June to boot.

The original plan was going to be a 7.4kw system, but instead, we're doing a little over the minimum requirement which was 1.7kw, and I'm installing 2.1kw.  I'm putting 5 panels on the roof of my house, which will be a lower infrastructure cost as well.  The good news all around is it's more affordable, I can expand later when I have the resources, the permit for this type of system can be issued in 24 hours and they're installing it all the week of Memorial Day!  One less obstacle to building permit final happening as soon as is feasible.

So, all that said, on track to migrate in the month of June, and with the developments of this week, this could actually synchronize to stick that landing after all.  My life...awe and wonder.

 

Friday, May 10, 2024

Getting gorgeous

This phase is definitely fun...some of the work being done has big imprints, super noticeable and other things are less apparent, yet a lot of effort is being put into the little things at this stage.

The headline of the week was tiling the bathroom.  Such a cool process to watch happen.  The first thing that went down was the floor.

Precision tiling is more like it...Dennis Ward's team, inclusive of his son Danny, have been meticulous in all the ways you'd hope.   Straight lines, choices about where to put whole tile, where to cut, etc....next was laying out the shower floor tile.  They did a mock up and noticed predictable gaps of varying size between tile elements...so they checked with me about whether I'd be OK with that.   I knew it'd be the case...and when I went to go look at it and give the go ahead, I had a notion of what could mitigate the bigger gaps.


If you look closely, you might detect it.   A dear family friend, a peer to my parents, Debbie Ruth, shared with me a while back that she collects rocks.  She happens to collect heart shaped rocks, which I do as well.  She gave me a whole box of them, and I immediately knew they'd be the ideal thing to slip into the space...heart shaped rocks of many sizes, I culled through the stash and picked out ones that were small enough to be candidates and voilà!  The tile team loved the idea and set about to drop heart shaped rocks randomly around, so now, when you look down, there's the whimsical appearance of a heart at your feet!  😍

That's how it ended up...and here's the bathroom, complete, and drying: 
Light and shadow don't help in seeing it in a picture but it's so fabulous...again, another thing you choose from a paint swatch size of example and the relief when it all looks OK at scale!!!

You can see in that image that the vanity drawers were installed, same with the kitchen cabinets:

The facings go on last...and, today the cabinetry was measured for the countertops!  

Appliances arrived too:

Electrical will likely get worked in next week, while exterior trim gets completed and I believe the hot water heater is coming in as well...you can see the big equipment outside ready to install the septic system too...step by step!!! 



Friday, May 3, 2024

Fast Track to Finish(es)!

I wasn't kidding about the roller coaster....lots of things happening quickly, and it's a dynamic set of activities that get scheduled, then changed, then multiple things go on at the same time...you get the picture.  And, its ALL good!

The tile crew started their work on the bathroom this week...they laid down material for water protection on the walls and concrete slab, they mudded the pan for the shower, and we passed an inspection for all that.  



Trim work continued as well...the doors are all trimmed up ready for painting:


And the light trough that will cast light up onto the ceiling in the living area is installed too...great craftsmanship on the part of Francis and Steve on the contractor's team...


Today, a great gift, the cabinets were ready to be installed.  The infrastructure, mind you, the drawers and fronts will come later but these being ready now lets the templates for the countertops be measured two weeks ahead of what was anticipated. I chose to build them at 41" high, for this tall gal.  Thomas Loos, cabinet maker, is a rock star!

Kitchen...there's a gap on the wall side for the refrigerator...and the bathroom vanity:
Baseboards are arriving today so that will likely start up next week, tiling will be done in the bathroom,  On Friday, the appliances are delivered and the countertop templates are measured, with product to be delivered in about two weeks.   Like I said, Fast Trackin'!!!

We also had a meeting on site with the excavator who will do the site grading and install the septic system, and the geotechnical engineer (my brother in law) and my contractor to validate the next steps in earth work and clarify how we will use the spoils from the excavation for the tanks, etc...that work will start the week of May 13 so the prospects of having a septic permit finaled in June are going up by the day!

Not a bad way to head into the weekend....



Thursday, April 25, 2024

Gliding toward completion - and we're ahead of schedule!

It's definitely the down swoosh on the roller coaster ride now!

Adaptation R Us...continued.  I can't recall if I shared that the intended ceiling for the house is a tongue and groove wood, in 14 bays/pie wedges of the house architecture.  That feature is something I have enjoyed in my friend KT's house and was a big part of my vision for my home and what I would be experiencing living in it...and then there's reality.

Getting to the point of working on that and deciding on materials, etc...it became clear that the cost of wood and labor to do it would be around $30,000.  That made it a hard no.  Took a minute to adjust the vision and expectation around that and pretty quickly came to an alternative.  I was attracted to the idea of doing box beams on each of the hip trusses.  I thought at least that would give an echo of the infrastructure above it (which we all wish could be visible!) without the same investment in materials or time.  After creating a mockup of the faux beams, it became further apparent that even that much wood would feel weighty, that the size of my home was too small for that to not feel heavy, bring the ceiling down as it were.  

So we landed on a final compromise...we put trim at each of the hip trusses that will be painted the same color as the ceiling - so we get the effect without the bulk.  Painting them vs staining or leaving them as raw wood I hope will make it less wagon wheel-y.  Here's a glimpse of it in progress and what it's like at the center:


 

I'm pretty pleased with it...and who knows, maybe some day if I get a sufficient infusion of resources I'll put the tongue and groove wood in!  We also put trim on the tops of the walls which will also be painted just to give that a more finished look.

The other big push forward this week is the flooring arrived and is being installed!   First, they put down a liquid, self leveling compound.  Pretty wild stuff, it finds imperfections and dips in the slab and fills them in, creating a truly level surface to work with.  It dries over night and then they lay down the flooring.


 

I love it...so happy it looks how I hoped it would given, again, you look at a piece of sample and try to envision a room of it...so far, so good!  This is in the entire house except the bathroom where there will be porcelain tile.  That work starts next week.

So...today my contractor exclaimed, as if surprised himself, "we are ahead of schedule!" 

Thursday, April 18, 2024

White no more!

Been waiting for more obvious change to be apparent to share an update.   The crew that did the drywall, tape and texture have completed their work.  It was really cool to watch - and again, everything done BY HAND.  This guy did the entire texturing job himself!  Check out the results..




Next the painting crew came in and primed the entire house:

SERIOUSLY white at this stage!!!

Then, the color went on...a first coat throughout and they'll come back and do a second when everything's installed. Me likey!!!




Making even more changes as reality meets the imagined...all livable and, in some cases, an improvement over the original thought...stay tuned!




Friday, March 29, 2024

The whitest my home will ever be!

I may not have been explicit about this before now but, there is NO white in my house design, anywhere,..except the A/C split units which is kind of unbelievable that given their popularity, they haven't really begun to make them in other colors than white!  The good news, however, is that I've designed a screen for them that will almost make them disappear in the space.

I digress...my point is, there isn't any intentionally chosen white anything in the entire house.  So this current moment is pretty wild, and pretty extreme.  The interior is sheetrocked and voila, the most white you're ever gonna see in the place!!!







Tape and mud are next, then texture which will happen next week.  The first coat of paint goes on after that and then we build the faux beams and light trough and it flows from there.

I'm giving my landlords 90 days notice with this next month's rent.  😬  Can you say things are getting REAL?!!!  Pretty awesome. 
 

Monday, March 25, 2024

Goodbye trusses!

 Lots of things have happened in the past week...

The front door frame was installed with a temporary front door.  I'm having an etched glass front door made so it'll be the last thing to go in.   On Friday of last week, my contractor and I went to a reclaimed goods business in the area and hit paydirt.  I was able to source a pre-hung wood door in beautiful condition for the second room/zen den, louvered swing doors for the laundry room (louvered required, to vent the hot water heater), and two solid core pocket doors and the pull hardware for them...all for under $300!!!  That's how we roll...💪🏽

The door being installed allowed the final siding to go on that panel, and all the trim is pretty much done too.  The sheet rock team did all the exterior work first, putting the necessary fire rated material into the porch roof extensions, and they'll finish the soffits this week.  

So an interesting development discovered by the sheet rock team...when they went to look at the roof trusses for adhering the drywall, they discovered some of them were bowed a bit.  An easy fix by sistering some wood along the trusses but interesting because when Jeff was here, (the guy I brought in to lead the shell arrival and assembly) he told me a story of a project he helped out with when they had an issue that kept them from completing their assembly and it had to do with a torque on the roof trusses - caused by the hold down process - can't recall if it was doing something out of sequence or too tightly or what but I think that's what happened in this case.  It's a micro measurement of deviation from norm and has no structural vulnerability associated with it, but it mean a couple of days of hammering wood onto the trusses.

The ceiling is coming along...bye bye trusses!


Another issue that needed solutioning this week had to do with the venting plan for the kitchen.  My vision has never included range hood that vented out through the ceiling...always wanted to keep the open nature of the ceiling.  California has energy efficiency regulations, Title 24, and CalGreen which are monitored and the fulfillment of which is signed off on by an energy engineering firm...yes, I had to hire them to provide a checklist of what was required to comply with the regs and to do two inspections, one at close-in and the other at final.  So the CalGreen peeps told my contractor on Monday that the regs do NOT allow ductless venting any longer...he reached out to me on Monday afternoon at 4p to let me know we had to figure out a way to vent outside.   This comes AFTER we have sprayed the insulation into the ceiling - not great no matter what but really shitty timing to get told that!

I was not convinced...I had done my due diligence before we even drew up plans, I knew there was a way for this to work but looking at the regs, a classic case of in one area it describes situations where it's allowable and another area says things that suggest it's not...clear as mud. We met at the house first thing on Tuesday morning, and the HVAC contractor came too to add to the creative mix.  I had gone down to the house on Monday evening with Buzz and Jean to look at it and see what options could be livable that don't go through the ceiling.  The least offensive approach we agreed was to do a wall mounted vent, and duct out to the exterior but encase it in a soffit and run that soffit on the whole wall length for symmetry.  

After that exploration, I got to sleuthing the official word on the regs, and I found all the references needed and reached out to the energy engineering firm and got THE GUY who could definitively say what's possible.  He concurred, it is allowable to have a recirculating hood vent IF there is another exhaust system in the kitchen (there are different regs for enclosed and open plan kitchens as well, of course!).  That meant all we would need to do is get an exhaust fan that met code - minimum 300 CFM - and we were in business, I could have the ductless vent hood!

I sourced the code-satisfying units for both the hood and the exhaust fan and the only thing we'll need to do is pop out a piece of the siding for a 10x10 fan and we are good to go!  PHEW.

Everything that's happening now is adding heft, so to speak - the house is beginning to feel like one vs a construction project.   Super fun to watch happen.  Super grateful.




 

 

Thursday, March 14, 2024

In we go!

One quick trip to the County Permit offices when I returned from DC with the exemption form in hand and the sprinkler requirement was vanquished!  The close-in inspection happened on Tuesday of this week and we passed so we are clear for interior work to proceed apace!

Here's what the interior looked like in preparation for the inspection - all the equipment has been moved out (well almost all) and you can really get a sense of space, anew. 






This morning, the insulation team showed up.  They laid plastic down on the entire place and covered any exposed windows.  They sprayed isoprene into the trusses in the ceiling - code requires they're covered at least 6 inches down from the roof.  Check it out!









When I checked in this afternoon, the guy in the paint suit was spraying a fire retardant paint onto the insulation, covering the entire surface, again.  The paint is kept active by stirring it up and feeding the pump.



A second team showed up so it let them complete ALL of the insulation in one day - they did the batt insulation in the walls as well:

 

The front door frame, and a temporary door, arrive on Monday as does the sheetrock for the interior!  Drywall install starts next week and will be about a week to complete, inclusive of taping, mud and cat scratch finish.  

We assembled a go forward schedule today - knowing full well timing can be mythical - but at this juncture, things are a lot more reliable.   Here's the hoped for sequence of events:

March 18 & 25 week - Drywall install, front door install and final trim on exterior

April 1 week -Finish patios, Paint prime and one cover coat throughout

April 8 and 15 week - build box beams and light troughs and install

April 22 week - Flooring, potentially bathroom tiling

May 1 week - cabinet install, final plumbing, elec and mini-split installs,

May 6 week - countertops install, sinks, insinkerator, under counter water chiller, appliances in

And none of this speaks to the septic system that needs to be installed and the carport and solar that have to be completed before the County will sign off on the building permit...always more to deal with!!!!