Saturday, October 21, 2023

Almost there.....

All systems are go!  We are on a glide path to slab, AND, the septic permit was issued last week so we are on our way to major infrastructure completion.

 

The race is on to get that system in before bigger rains, and to get the slab poured as well.  We are looking at a few weeks of good weather so no imminent threats of rain...so far. 

The patio footings have been poured and are awaiting filling.  The guy in the yellow shirt in these images has more upper body strength than I have in my whole body...he holds, directs, lifts that hosing FILLED with concrete and moves it where it needs to go with such precision...








Those are just the footings.  The patio sections need to be filled with sand, rock, fabric just like the main house pad.  Before all that can be finalized, including the main pad, the plumbing had to be dropped in and stubbed up above the level of the final slab pours.   

Look at all the piping in this picture!  This 1000 sq ft home has three sinks, one toilet, a shower, a hot water heater and a washing machine needing water and wastewater connections.  It looks like the london tube map to me!!!  😂

 


There'll be another inspection of the utilities (water and elec) on Monday, then final fill and rebar are installed and the slab pour should be Thursday of next week!  The patios will follow, either the day after or soon...

An update on the shell delivery, we had to bump it to the week of December 4.  Knowing the when lets us plan all the subsequent steps but...don't tell anyone, I could be living in this house by March!  😲

In the meantime, the latest quote on the port-a-potty:

 


Until next week....thanks for glancing in this direction and coming along for the ride. 💓

Thursday, October 12, 2023

Fill 'er up!

This week moved the foundation process dramatically forward.  The day after the footings were poured, the form boards came off and it is now possible to really see the future space of the house.

The next task was setting up the form boards for the patios and stem walls.  The North patio was first, it having the larger stem wall.  Same process as the footings - trench dug, form boards placed and rebar dropped in.


 

With that in place, they moved on to the south side, where the entryway will be.  Trench and forms there too with rebar.


 



All the while, the fill for the slab is being laid down.  It's multi-layered...there's a fabric that goes down, then sand, then rock and it's all compacted.  The plumber still has to lay down pipes and then they put a final layer over and it's ready for pouring.  





SO great to have skillful people, good people doing good work.  Monday the plumber will come and lay down the pipes, we'll have an inspection on the rebar in the patios and they'll pour concrete on Tuesday for the patios.  The slab will get finished and be poured as soon as it can be...wohoo!!

Oh, and on timing, we have confirmed we will be sending for the shell to arrive the week of November 27.   That's when, as they say, shit gets really real.

Does not suck to gaze out at that scene....

And the winning number is......4511!

A new address, another step into the realm of the reality of it all.  My new home will be located at 4511 West Dry Creek Road!   It's kinda funny to me that I'm moving from 2311 W Dry Creek to 4511...no need to wonder how far down the road I will be, eh?!!!

The big deal about getting the designated address is I can now get power to the property.  I've mentioned before the temporary and permanent power paths - both are activated, but in order to move forward on the permanent power project, the address is required.  In the meantime, my BFF at PG&E, Omar, got my temporary power scheduled for activation today.  

It was a big day at the site...PG&E first showed up and did as much setup as they could however the existing power pole from which they'd extend the line to my site has a transformer that is not only antiquated, it was leaking.  He could not make the connection.   The good news was that he then put this project into emergency status for a transformer replacement and upgrade and it actually happened TODAY!  


Everyone loves to bash PG&E and I understand there are a lot of ways they can improve but I'm telling you, these guys were skillful, graceful in the task, communicative, and just really decent guys.  They arrived an hour after the request was put in (shocking) and it took about 4 hours to get things set up.   So, in a nutshell, we now have power.  Not only that, but they upgraded the transformer so we may not need to upgrade again for permanent power...remains to be seen but today was a really fortunate day.

I've got a mailbox ordered, and we're going to upgrade the mailbox post at the end of the driveway that now holds 4 mailboxes, soon to be 5!

Tuesday, October 3, 2023

She's not going anywhere.....

 Today was a BIG day.   It started peacefully enough, sunrise over the valley, cool temps...



The plan for pouring the foundation footings was for three cement trucks, each loaded with 8 yards of mix to keep the truck lighter given the impact of the weight on the driveway plus it's a bit steep and it's not good to have the concrete on a slope cuz it'll try to pour out of the truck apparently!  The setup involves a truck and a pump - and those guys jockeyed those rigs amazingly smoothly on a narrow driveway, it was like watching synchronized swimming!

A bit of a visual aid for the point about weight - check out these tires, that should give you a clue as to the weight of the load - they're not flat by the way!


The truck pours concrete into the pump that send it out to the foundation in a big giant hose..the guy who handled that is unbelievably strong, and deft!




It's poured into the form boards and oozes out to fill the trench below.  It's over filled, then another tool is used to pump air down into the muck so it all condenses down and compacts.

Next, they come along and smooth over the surfaces by hand.


And they keep going, until they get all the way around.  There's another tool, looks a bit like a jackhammer, that vibrates and it helps keep the form boards exactly where you need them after the concrete goes in and tries to widen them out.






It's really like watching a great ballet or something...they are so smooth in their movements, so skillful in the task.  And in the end, we get this:

They remove many of the supporting boards so they don't get fixed into the concrete and tomorrow all of the form boards will come off.  It'll be a concrete foundation ring!


I can't think of a more dramatic image of the slope!  It's look more level by the day to my mind's eye.  Can't wait to stand on the slab that will be poured into the middle.

It only took about two hours for the pour, a bit more to finish up.   That house is not going anywhere!  Next, the footings and support for the side patios will be framed up and readied for pouring which we hope can happen in conjunction with the slab pour.  Plumbing has to get their pipes in and walls have to be mapped out for the stubbing up of water and wastewater pipes before the gravel and sand can be put into fill up the interior and be ready for a slab.

Stay tuned!