Tuesday, October 3, 2023

She's not going anywhere.....

 Today was a BIG day.   It started peacefully enough, sunrise over the valley, cool temps...



The plan for pouring the foundation footings was for three cement trucks, each loaded with 8 yards of mix to keep the truck lighter given the impact of the weight on the driveway plus it's a bit steep and it's not good to have the concrete on a slope cuz it'll try to pour out of the truck apparently!  The setup involves a truck and a pump - and those guys jockeyed those rigs amazingly smoothly on a narrow driveway, it was like watching synchronized swimming!

A bit of a visual aid for the point about weight - check out these tires, that should give you a clue as to the weight of the load - they're not flat by the way!


The truck pours concrete into the pump that send it out to the foundation in a big giant hose..the guy who handled that is unbelievably strong, and deft!




It's poured into the form boards and oozes out to fill the trench below.  It's over filled, then another tool is used to pump air down into the muck so it all condenses down and compacts.

Next, they come along and smooth over the surfaces by hand.


And they keep going, until they get all the way around.  There's another tool, looks a bit like a jackhammer, that vibrates and it helps keep the form boards exactly where you need them after the concrete goes in and tries to widen them out.






It's really like watching a great ballet or something...they are so smooth in their movements, so skillful in the task.  And in the end, we get this:

They remove many of the supporting boards so they don't get fixed into the concrete and tomorrow all of the form boards will come off.  It'll be a concrete foundation ring!


I can't think of a more dramatic image of the slope!  It's look more level by the day to my mind's eye.  Can't wait to stand on the slab that will be poured into the middle.

It only took about two hours for the pour, a bit more to finish up.   That house is not going anywhere!  Next, the footings and support for the side patios will be framed up and readied for pouring which we hope can happen in conjunction with the slab pour.  Plumbing has to get their pipes in and walls have to be mapped out for the stubbing up of water and wastewater pipes before the gravel and sand can be put into fill up the interior and be ready for a slab.

Stay tuned!

Friday, September 29, 2023

Fast Forward!

I suppose that may be a relative term but oh my this week a lot got done!  

The rebar came into the scene next, not only the cages at the base of the foundation but all of the rebar that will connect the slab to the foundation.  Each of these rods will be bent over once it's time to pour...

 


Pipes were cut into the form boards to accommodate the wastewater egresses, the electric that needs to run from outside->in and vice versa and to provide for "seep" from under the foundation.   

 

The electric conduit is laid down, and mapped to the places in the house where it's needed with the main panel setup being near the front door.



 I just get giddy wandering around this site!  Seriously this STILL so does not look level to me:


And yet, it is:

 

Today a County foundation inspector came, and the guys had to wait around in a 4-hour window...I brought sandwiches and we sat on my picnic bench under the oak tree...a really beautiful clear air day today...I have such deep respect for their expertise - they are good people with great talent and I remain so grateful for their being on the team.  The inspection passed. 

This week's port-a-potty adornment, therefore, is:

 

In continuing good news, Omar, one of my PG&E BFFs notified me temporary power was approved!  I went today and got the necessary temp and private power pole permits and set up the required inspection for Monday.   My other PG&E BFF, Brandon, who is handling my permanent power application process is going to come out on Tuesday to do his first site assessment and measurements so that's rolling too.  I can't move that forward until I have a separate street address but having gone to the County permit office today, I was able to meet my permit tech, Audrey, and she was in a good and playful mood today so we got a lot done!  She's gonna work on my address next week so fingers crossed, we could have permanent power for the shell install.

A great week.   We pour the footings on Tuesday, wohoo!!!

 

Friday, September 22, 2023

We are Rollin'!

Wasting no time!   Jeff, the excavator, created the trench for the foundation footings.  For sure this was the first time he's ever dug in a circle!!


 

The Port-a-Potty is a bit of an eyesore, even with trellising around it...so I decided to start a rotation of embellishments...this is the first installment:
 

 

Next, Steve, the guy who's building the foundation and pouring the concrete got to work and began to lay out the batter boards.  Yes, I'm learning a whole new vocabulary - cuz I needed a few more words in my repertoire!  😂

Given the layout of this foundation, for sure the team's brains hurt with all the calculating and measuring.  I bow to Steve's expertise, it's dazzling to watch in action.


I don't know if I can adequately convey how exciting it was for me to see the first form boards go in...which represent each of the panels in the house.  The first installed was the front door panel - it made it come to life even further.   


From there it went pretty quickly as all 14 panels are like pie pieces...get the center line set, create a grid of snaplines to double, triple and relentlessly check measurements against the plans and you've got it!

It honestly hurt my brain to look at it at this stage...well, it still does but...this is level.  My brain does not see level, yet it is. It reminds me of those old movies in school teaching you about perspective where a person is in a box, that looks like a normal room but when they walk they seem to shrink into a really small sized wall.   Anyway, it's a trick of the eye where there is slope.  Here is what this effort is aimed at creating given the high side of the slope is about 5 feet higher than the downside.

 


 So there'll be a stem wall at the low end that's over 5' high and a shorter one on the high end.

 


That begins to explain these form boards.  



Next they filled the trenches with rebar that is bent into long box shapes.   They have some wicked tools that aid in all that...in the meantime I bought a generator to power all the tools cuz we don't yet have temporary power but I have two great account managers at PG&E hustling on my behalf to get both the temporary power going and the permanent in play - turns out the existing transformer on the property needs to be upgraded so we won't get perm power as quickly as we imagined but it's all good.

The electrical and plumbing subs came to the site yesterday and we worked out the plans for the conduit, chasers and plumbing for wastewater, greywater and water that will go under the slab and be stubbed up through it.  First a waterproof membrane like landscape fabric will go down on the existing base, then the electric conduit will go on that and gravel and perhaps some sand will be used to fill in the circle whilst the pipes are laid into it and drilled out the future stem walls and footings.  All that will be compacted before the slab is poured.  

The current fantasy wish is that we will pour the slab in mid-late October so we can get the shell here in early November.  I love mythical timing.

In other good news, the week ended with the septic plan having been reviewed without pushback and we should have that permit cleared within the week!  There is a bit of a horse race on to get this work done before it begins to rain here.   It's flowing though!

Awesome team, fortunate logistics, and favorable weather.  Life is pretty damn generous.

Friday, September 15, 2023

And so it begins....

 At last, we can do what we've been wanting to do for ages...the team of the excavator, foundation builder and concrete guy, contractors and geo technical engineer showed up at 7:45 am yesterday and began to get real about where, exactly, we are setting this thing up!



Checking, double checking, measuring, adjusting, rethinking, measuring again...fortunately a lot of really competent people were in the mix!  The task was to determine the orientation of the structure so as to set the first panel location to be able to measure from that the rest of the layout.

The excavator needed to do a small cut in the high side of the slope and I have to say, the whole thing looks WAY more slope-y to me now!   Ultimately, we got a circle on the ground that could be dug for foundation footings.

 



 And now, to dig the trench...and the first scoop happened just a few minutes ago!!  Wohoo!



 

 


Monday the foundation builder will start to lay out the form boards and the foundation will come to life!


Monday, September 11, 2023

We are GO for launch!

THIS IS WHAT WE HAVE BEEN WAITING FOR!!!!

 

What a long strange summer it's been....I haven't posted since June because, frankly, there was nothing to say while things ran the gauntlet of permit approval.  We got a VERY particular plan reviewer who provided comments and set expectations for additional information back in June.  It took 2 months to prepare the response - meeting their requirements involved special inspections arranged in North Carolina where they had to take some of the manufactured panels out of the storage truck to validate, of all things, nail sheathing.  The first of many inspections to come but fortunately a great team of professionals leaned in, problem solved and got it done.

The building permit was approved on August 30, exactly 8 months from the day we filed the application, and we will start excavating this week!

By way of update, we didn't sit idly by all summer, so let me regale you with what has been done to prepare for the tasks ahead - I didn't want to post about too much of it, waiting for the permit to clear before elaborating on the site prep we went ahead with.

So...thus far, we have trenched (both by hand and equipment) the water line from the water tank down to the house site - which required running the line under two driveways, one unpaved, one paved.  Now have water available there for the site work that will ensue.  We also put in a french drain to move water away from the house site as there is a natural flow of water under this hill that needs mitigating.



A glimpse of the digging from the tank





 The trench down to the site

The other projects we have completed (at least we've taken them as far as they can go before PG&E gets in the mix) is to install the power pole that will be the location of the meter and panel and we trenched conduit down to the house site also - it's ready to go when PG&E activates the power, which should be within the month as I have already qualified for express activation.  We shall see!  It was wild to watch these guys work....as you can tell, I'm geeking out over all of it!  Check out this process of drilling, installing and setting the attachments for PG&E:







 

And, the electric trench and conduit are in - ran that line on the other side of the oak tree...requires not only digging but filling with layers of rock and sand.  



SO...we are READY!

This Thursday and Friday (9/14-15) we will begin to excavate the footings for the foundation and compress the soil for the slab.   Next Monday, the concrete/foundation dude, Steve, will start measuring and laying out the form boards and off we go.

I'm meeting with my contractor on Friday now that we have approved and stamped plans to work with to set the go forward plan so as to reasonably estimate when we can send for the shell.  

It feels great to move from the waiting lane to the doing lane...and I know more waiting will come but really happy to enter this phase!